Project intelligenceTDLR EABPRJB2814593Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

RIVER WALK IMPROVEMENTS PHASE 3

AREAS 10, 13, 14 & 18, San Antonio, TX, 78205

Construction complete · Aug 2013Project Closed

RIVER WALK IMPROVEMENTS PHASE 3 is a renovation/alteration project at AREAS 10, 13, 14 & 18, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2013). The project has an estimated value of $2.6M.

Estimated project value
$2.6M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 1mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 13, 2012414 days across supplied datesAug 1, 2013

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    18 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    396 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78205 (San Antonio)

One email per change. Unsubscribe in one click. Privacy.

RIVER WALK IMPROVEMENTS PHASE 3 is a Renovation/Alteration project located at AREAS 10, 13, 14 & 18, San Antonio, TX 78205 in San Antonio, Texas. The project has an estimated value of $2.6M. CITY OF SAN ANTONIO is the property owner and BEATY PALMER ARCHITECTS is the design firm of record. The project was registered with TDLR on June 13, 2012.

Frequently Asked Questions

What is RIVER WALK IMPROVEMENTS PHASE 3?

RIVER WALK IMPROVEMENTS PHASE 3 is a renovation/alteration project at AREAS 10, 13, 14 & 18 in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: repair and renovation to various areas of the San Antonio River Walk

Is RIVER WALK IMPROVEMENTS PHASE 3 open in San Antonio?

Construction on RIVER WALK IMPROVEMENTS PHASE 3 is complete — TDLR records show the project passed its required accessibility inspection in Aug 2013. The building is finished and very likely open.

Where is RIVER WALK IMPROVEMENTS PHASE 3 located?

RIVER WALK IMPROVEMENTS PHASE 3 is located at AREAS 10, 13, 14 & 18, San Antonio, TX, 78205, in Bexar County.

Who is the owner or developer of RIVER WALK IMPROVEMENTS PHASE 3?

CITY OF SAN ANTONIO is the property owner/developer of record for RIVER WALK IMPROVEMENTS PHASE 3, per its TDLR project registration.

Who is the architect or design firm for RIVER WALK IMPROVEMENTS PHASE 3?

BEATY PALMER ARCHITECTS is the design firm of record for RIVER WALK IMPROVEMENTS PHASE 3, according to its TDLR filing.

How much does RIVER WALK IMPROVEMENTS PHASE 3 cost and how big is it?

RIVER WALK IMPROVEMENTS PHASE 3 has an estimated construction value of $2.6M, based on its TDLR filing.

Scope of Work

repair and renovation to various areas of the San Antonio River Walk

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

AREAS 10, 13, 14 & 18, San Antonio, TX, 78205

29.42123, -98.47599

Watch all construction in 78205 (San Antonio)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in San Antonio?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.