JCP is a renovation/alteration project at 11200 LAKELINE MALL DRIVE, Cedar Park, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2012). The project has an estimated value of $80K.
Project has been completed and closed
JCP is a Renovation/Alteration project located at 11200 LAKELINE MALL DRIVE, Cedar Park, TX 78613 in Cedar Park, Texas. The project has an estimated value of $80K. JC PENNEY COMPANY INC. is the property owner and CALLISON ARCHITECTS is the design firm of record. The project was registered with TDLR on June 18, 2012.
JCP is a renovation/alteration project at 11200 LAKELINE MALL DRIVE in Cedar Park, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Tenant interior improvements.
Construction on JCP is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2012. The building is finished and very likely open.
JCP is located at 11200 LAKELINE MALL DRIVE, Cedar Park, TX, 78613, in Travis County.
JC PENNEY COMPANY INC. is the property owner/developer of record for JCP, per its TDLR project registration.
CALLISON ARCHITECTS is the design firm of record for JCP, according to its TDLR filing.
JCP has an estimated construction value of $80K, based on its TDLR filing.
Tenant interior improvements.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jun 18, 2012
Review Complete
Inspection Complete
Closed
Aug 1, 2012
Building permits found at or near this location
Commercial Roof Recover of existing low-slope roofing system. No structural modifications. No change to building footprint use or occupancy. (Macys Building)
Interior tenant fitout of an existing retail space
Replacement of complete existing central heat and air system with or without duct work HVAC changeout: replace existing 2-ton horizontal gas furnace and matching two-stage air conditioner with new like-for-like units
Replacement of furnace only
Install Level 2 EV Charger