Project intelligenceTDLR EABPRJB2817445Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

NAVASOTA 2011 TCF DOWNTOWN SIDEWALK REV.

200 E. MCALPINE, Navasota, TX, 77868

Construction complete · Apr 2014Project Closed

NAVASOTA 2011 TCF DOWNTOWN SIDEWALK REV. is a renovation/alteration project at 200 E. MCALPINE, Navasota, in Grimes County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2014). The project has an estimated value of $160K.

Estimated project value
$160K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 8mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 2, 2012636 days across supplied datesApr 30, 2014

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    30 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    606 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77868 (Navasota)

One email per change. Unsubscribe in one click. Privacy.

NAVASOTA 2011 TCF DOWNTOWN SIDEWALK REV. is a Renovation/Alteration project located at 200 E. MCALPINE, Navasota, TX 77868 in Navasota, Texas. The project has an estimated value of $160K. CITY OF NAVASOTA is the property owner and O'MALLEY ENGINEERS LLP is the design firm of record. The project was registered with TDLR on August 2, 2012.

Frequently Asked Questions

What is NAVASOTA 2011 TCF DOWNTOWN SIDEWALK REV.?

NAVASOTA 2011 TCF DOWNTOWN SIDEWALK REV. is a renovation/alteration project at 200 E. MCALPINE in Navasota, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Demolition/removal and reconstruction of existing sidewalks, curb & gutter, an alley intersection with a street,

Is NAVASOTA 2011 TCF DOWNTOWN SIDEWALK REV. open in Navasota?

Construction on NAVASOTA 2011 TCF DOWNTOWN SIDEWALK REV. is complete — TDLR records show the project passed its required accessibility inspection in Apr 2014. The building is finished and very likely open.

Where is NAVASOTA 2011 TCF DOWNTOWN SIDEWALK REV. located?

NAVASOTA 2011 TCF DOWNTOWN SIDEWALK REV. is located at 200 E. MCALPINE, Navasota, TX, 77868, in Grimes County.

Who is the owner or developer of NAVASOTA 2011 TCF DOWNTOWN SIDEWALK REV.?

CITY OF NAVASOTA is the property owner/developer of record for NAVASOTA 2011 TCF DOWNTOWN SIDEWALK REV., per its TDLR project registration.

Who is the architect or design firm for NAVASOTA 2011 TCF DOWNTOWN SIDEWALK REV.?

O'MALLEY ENGINEERS LLP is the design firm of record for NAVASOTA 2011 TCF DOWNTOWN SIDEWALK REV., according to its TDLR filing.

How much does NAVASOTA 2011 TCF DOWNTOWN SIDEWALK REV. cost and how big is it?

NAVASOTA 2011 TCF DOWNTOWN SIDEWALK REV. has an estimated construction value of $160K, based on its TDLR filing.

Scope of Work

Demolition/removal and reconstruction of existing sidewalks, curb & gutter, an alley intersection with a street,

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

200 E. MCALPINE, Navasota, TX, 77868

Loading location map…
30.38724, -96.08827

Watch all construction in 77868 (Navasota)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Navasota?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.