SUN METRO BUS TERMINAL EASTSIDE
SUN METRO BUS TERMINAL EASTSIDE is a new construction project at 1165 SUNMOUNT DR, El Paso, in El Paso County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2012). The project has an estimated value of $377K.
๐Project Metrics
TDLR #EABPRJB2818560Project Closed
Project has been completed and closed
SUN METRO BUS TERMINAL EASTSIDE is a New Construction project located at 1165 SUNMOUNT DR, El Paso, TX 79925 in El Paso, Texas. The project has an estimated value of $377K. CITY OF EL PASO is the property owner and GA ARCHITECTURE INC is the design firm of record. The project was registered with TDLR on August 23, 2012.
โFrequently Asked Questions
What is SUN METRO BUS TERMINAL EASTSIDE?
SUN METRO BUS TERMINAL EASTSIDE is a new construction project at 1165 SUNMOUNT DR in El Paso, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: INSTALL A NEW EXTERIOR WALL SYSTEM TO EXISTIUNG BUILDINGS, RENOVATE EXISTING ELECTRICAL AND LANDSCAPING. INSTALL
Is SUN METRO BUS TERMINAL EASTSIDE open in El Paso?
Construction on SUN METRO BUS TERMINAL EASTSIDE is complete โ TDLR records show the project passed its required accessibility inspection in Nov 2012. The building is finished and very likely open.
Where is SUN METRO BUS TERMINAL EASTSIDE located?
SUN METRO BUS TERMINAL EASTSIDE is located at 1165 SUNMOUNT DR, El Paso, TX, 79925, in El Paso County.
Who is the owner or developer of SUN METRO BUS TERMINAL EASTSIDE?
CITY OF EL PASO is the property owner/developer of record for SUN METRO BUS TERMINAL EASTSIDE, per its TDLR project registration.
Who is the architect or design firm for SUN METRO BUS TERMINAL EASTSIDE?
GA ARCHITECTURE INC is the design firm of record for SUN METRO BUS TERMINAL EASTSIDE, according to its TDLR filing.
How much does SUN METRO BUS TERMINAL EASTSIDE cost and how big is it?
SUN METRO BUS TERMINAL EASTSIDE has an estimated construction value of $377K, based on its TDLR filing.
๐Scope of Work
INSTALL A NEW EXTERIOR WALL SYSTEM TO EXISTIUNG BUILDINGS, RENOVATE EXISTING ELECTRICAL AND LANDSCAPING. INSTALL
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 23, 2012
Review Complete
Inspection Complete
Closed
Nov 1, 2012
๐Related Projects
๐คSame Owner
$1.31B total๐๏ธSame Design Firm
$1.1M total๐Nearby Projects
Within 1 kmProperty Owner
Design Firm
El Paso County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in El Paso County
Find General Contractors in El Paso