Project intelligenceTDLR EABPRJB3000047New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

RIO VISTA RAILROAD PEDESTRIAN TRAIL

555 CHEATHEM STREET, San Marcos, TX, 78666

Construction complete · Jun 2014Project Closed

RIO VISTA RAILROAD PEDESTRIAN TRAIL is a new construction project at 555 CHEATHEM STREET, San Marcos, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2014). The project has an estimated value of $150K.

Estimated project value
$150K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
5 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 1, 2012577 days across supplied datesJun 1, 2014

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    426 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    151 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78666 (San Marcos)

One email per change. Unsubscribe in one click. Privacy.

RIO VISTA RAILROAD PEDESTRIAN TRAIL is a New Construction project located at 555 CHEATHEM STREET, San Marcos, TX 78666 in San Marcos, Texas. The project has an estimated value of $150K. CITY OF SAN MARCOS is the property owner and FRIEDMAN, JOHN is the design firm of record. The project was registered with TDLR on November 1, 2012.

Frequently Asked Questions

What is RIO VISTA RAILROAD PEDESTRIAN TRAIL?

RIO VISTA RAILROAD PEDESTRIAN TRAIL is a new construction project at 555 CHEATHEM STREET in San Marcos, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: TRAIL IMPROVMENT UNDER EXISTING UPAR BRIDGE ALONG THEBANK OF RIVER. PF175/VAR175

Is RIO VISTA RAILROAD PEDESTRIAN TRAIL open in San Marcos?

Construction on RIO VISTA RAILROAD PEDESTRIAN TRAIL is complete — TDLR records show the project passed its required accessibility inspection in Jun 2014. The building is finished and very likely open.

Where is RIO VISTA RAILROAD PEDESTRIAN TRAIL located?

RIO VISTA RAILROAD PEDESTRIAN TRAIL is located at 555 CHEATHEM STREET, San Marcos, TX, 78666, in Hays County.

Who is the owner or developer of RIO VISTA RAILROAD PEDESTRIAN TRAIL?

CITY OF SAN MARCOS is the property owner/developer of record for RIO VISTA RAILROAD PEDESTRIAN TRAIL, per its TDLR project registration.

Who is the architect or design firm for RIO VISTA RAILROAD PEDESTRIAN TRAIL?

FRIEDMAN, JOHN is the design firm of record for RIO VISTA RAILROAD PEDESTRIAN TRAIL, according to its TDLR filing.

How much does RIO VISTA RAILROAD PEDESTRIAN TRAIL cost and how big is it?

RIO VISTA RAILROAD PEDESTRIAN TRAIL has an estimated construction value of $150K, based on its TDLR filing.

Scope of Work

TRAIL IMPROVMENT UNDER EXISTING UPAR BRIDGE ALONG THEBANK OF RIVER. PF175/VAR175

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

555 CHEATHEM STREET, San Marcos, TX, 78666

29.87848, -97.93178

Related City Permits

Building permits found at or near this location

555 E 5TH ST UNIT 2729
29.14 mi away

Replacement of complete existing central heat and air system with or without duct work Chilled water air handler with electric heat

FinalMechanical PermitChange OutMay 2026
View Details
2026-061903 MP
Reliable Refrigeration and Commercial Kitchen Equipment
555 E 5TH ST UNIT 2729
29.14 mi away

Replacement of an existing water heater Swapping out electric water heater.

FinalPlumbing PermitChange OutMar 2026
View Details
2026-005988 PP
Home Plumbing Solutions LLC
555 E 5TH ST UNIT 3022
29.14 mi away

Replacement of an existing water heater

FinalPlumbing PermitChange OutApr 2024
View Details
2024-047261 PP
5555 N LAMAR BLVD BLDG D UNIT 105

CHANGE OF USE from Office to Medical Outpatient Office 2025 136168 DA - Approved

FinalBuilding PermitRemodelFeb 2026
View Details
2026-002848 BP
ATX Construction Group
5555 AIRPORT BLVD

Replacement of complete existing central heat and air system with or without duct work

FinalMechanical PermitChange OutAug 2024
View Details
2024-108194 MP
LPC Industries LLC dba LPC Services

Watch all construction in 78666 (San Marcos)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in San Marcos?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.