Project intelligenceTDLR EABPRJB3000208Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

CSJ: 0364-02-017

121 BYPASS, Coppell, TX, 75019

Construction complete · Jul 2019Project Closed

CSJ: 0364-02-017 is a renovation/alteration project at 121 BYPASS, Coppell, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2019). The project has an estimated value of $116K across about 1,000 sq ft.

Estimated project value
$116K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$116/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
6 years
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 8, 20132,284 days across supplied datesJul 10, 2019

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    115 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    2,169 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75019 (Coppell)

One email per change. Unsubscribe in one click. Privacy.

CSJ: 0364-02-017 is a Renovation/Alteration project located at 121 BYPASS, Coppell, TX 75019 in Coppell, Texas. The project has an estimated value of $116K covering 1,000 sq ft. DALLAS is the property owner and TXDOT- DES DIVISION is the design firm of record. The project was registered with TDLR on April 8, 2013.

Frequently Asked Questions

What is CSJ: 0364-02-017?

CSJ: 0364-02-017 is a renovation/alteration project at 121 BYPASS in Coppell, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: CONVERT 4 LANES DIVIDED TO 10 LANES URBAN FRWY WITHFRONTAGE RD (PHASE 2) BI/IV PF175 RV250 PD IN FULL

Is CSJ: 0364-02-017 open in Coppell?

Construction on CSJ: 0364-02-017 is complete — TDLR records show the project passed its required accessibility inspection in Jul 2019. The building is finished and very likely open.

Where is CSJ: 0364-02-017 located?

CSJ: 0364-02-017 is located at 121 BYPASS, Coppell, TX, 75019, in Dallas County.

Who is the owner or developer of CSJ: 0364-02-017?

DALLAS is the property owner/developer of record for CSJ: 0364-02-017, per its TDLR project registration.

Who is the architect or design firm for CSJ: 0364-02-017?

TXDOT- DES DIVISION is the design firm of record for CSJ: 0364-02-017, according to its TDLR filing.

How much does CSJ: 0364-02-017 cost and how big is it?

CSJ: 0364-02-017 has an estimated construction value of $116K and approximately 1,000 square feet (about $116/sqft), based on its TDLR filing.

Scope of Work

CONVERT 4 LANES DIVIDED TO 10 LANES URBAN FRWY WITHFRONTAGE RD (PHASE 2) BI/IV PF175 RV250 PD IN FULL

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

121 BYPASS, Coppell, TX, 75019

32.98626, -96.98993

Watch all construction in 75019 (Coppell)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.