0015-13-362
0015-13-362 is a additions to existing building project at Austin, Texas, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2014). The project has an estimated value of $160K.
πProject Metrics
TDLR #EABPRJB3000256Project Closed
Project has been completed and closed
0015-13-362 is a Additions to Existing Building project located at Austin, TX in Texas. The project has an estimated value of $160K. TXDOT DISTRICT AUSTIN is the property owner and TXDOT is the design firm of record. The project was registered with TDLR on May 22, 2013.
βFrequently Asked Questions
What is 0015-13-362?
0015-13-362 is a additions to existing building project at Austin in Texas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: NB COLLECTOR -DISTRB, GRADING, PAVEMENT, DRAINAGE STRUCT& PAVMNT MRKINGS BI/IV PF175 RV250 $$ PAID IN FULL
Is 0015-13-362 open in Texas?
Construction on 0015-13-362 is complete β TDLR records show the project passed its required accessibility inspection in Apr 2014. The building is finished and very likely open.
Where is 0015-13-362 located?
0015-13-362 is located at Austin, Texas, TX, in Travis County.
Who is the owner or developer of 0015-13-362?
TXDOT DISTRICT AUSTIN is the property owner/developer of record for 0015-13-362, per its TDLR project registration.
Who is the architect or design firm for 0015-13-362?
TXDOT is the design firm of record for 0015-13-362, according to its TDLR filing.
How much does 0015-13-362 cost and how big is it?
0015-13-362 has an estimated construction value of $160K, based on its TDLR filing.
πScope of Work
NB COLLECTOR -DISTRB, GRADING, PAVEMENT, DRAINAGE STRUCT& PAVMNT MRKINGS BI/IV PF175 RV250 $$ PAID IN FULL
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
π Compliance Timeline
π Project Timeline
Filed
May 22, 2013
Review Complete
Inspection Complete
Closed
Apr 1, 2014
πRelated Projects
π€Same Owner
$37.03B totalποΈSame Design Firm
$37.03B totalπRelated City Permits
Building permits found at or near this location
replacing the existing electrical distribution equipment 200A Main Distribution Panel (MDP) with a new Siemens 200A panel and replacing an adjacent 125A lighting panel with a new Siemens 125A lighting panel.
replacing 420 ft of water line
installing 3 sets of doors for special event with panic hardware
3-D BAR certificate of occupancy installed
Non-Structural re-roof to existing Commercial Building
πRelated Site Plans
City of Austin site plan approvals at this location