FAULKNER
FAULKNER is a renovation/alteration project at 8303 NO. MOPAC Suite A110, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2013). The project has an estimated value of $50K.
๐Project Metrics
TDLR #EABPRJB3801943Project Closed
Project has been completed and closed
FAULKNER is a Renovation/Alteration project located at 8303 NO. MOPAC Suite A110, Austin, TX 78759 in Austin, Texas. The project has an estimated value of $50K. PYRAMID PROPERTIES INC is the property owner and SIXTHRIVER ARCHITECTS is the design firm of record. The project was registered with TDLR on October 10, 2012.
โFrequently Asked Questions
What is FAULKNER?
FAULKNER is a renovation/alteration project at 8303 NO. MOPAC Suite A110 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior Tenant Finish-out
Is FAULKNER open in Austin?
Construction on FAULKNER is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2013. The building is finished and very likely open.
Where is FAULKNER located?
FAULKNER is located at 8303 NO. MOPAC Suite A110, Austin, TX, 78759, in Travis County.
Who is the owner or developer of FAULKNER?
PYRAMID PROPERTIES INC is the property owner/developer of record for FAULKNER, per its TDLR project registration.
Who is the architect or design firm for FAULKNER?
SIXTHRIVER ARCHITECTS is the design firm of record for FAULKNER, according to its TDLR filing.
How much does FAULKNER cost and how big is it?
FAULKNER has an estimated construction value of $50K, based on its TDLR filing.
๐Scope of Work
Interior Tenant Finish-out
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 10, 2012
Review Complete
Inspection Complete
Closed
Jan 1, 2013
๐Related Projects
๐คSame Owner
$4.7M total๐Related City Permits
Building permits found at or near this location
Main panel change out
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work Replacement of four (4) CHW air handling units (units #11 and #12 on the 2nd floor and #17 and #18 on the 3rd floor)
Replacement of complete existing central heat and air system with or without duct work
Express: partial reroof. Material change (asphalt shingles to metal) and 1850 sqft redeck Revision: Full re-roof instead of partial re-roof