RABB HOUSE REDEVELOPMENT
RABB HOUSE REDEVELOPMENT is a new construction project at 151 NORTH A.W. GRIMES, Round Rock, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2013). The project has an estimated value of $1.5M.
๐Project Metrics
TDLR #EABPRJB3802820Project Closed
Project has been completed and closed
RABB HOUSE REDEVELOPMENT is a New Construction project located at 151 NORTH A.W. GRIMES, Round Rock, TX 78664 in Round Rock, Texas. The project has an estimated value of $1.5M. CITY OF ROUND ROCK is the property owner and KAHICKMAN ARCHITECTS is the design firm of record. The project was registered with TDLR on October 26, 2012.
โFrequently Asked Questions
What is RABB HOUSE REDEVELOPMENT?
RABB HOUSE REDEVELOPMENT is a new construction project at 151 NORTH A.W. GRIMES in Round Rock, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of an approximately 3,600 square foot, split-level rental facility and associated site work/parking
Is RABB HOUSE REDEVELOPMENT open in Round Rock?
Construction on RABB HOUSE REDEVELOPMENT is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2013. The building is finished and very likely open.
Where is RABB HOUSE REDEVELOPMENT located?
RABB HOUSE REDEVELOPMENT is located at 151 NORTH A.W. GRIMES, Round Rock, TX, 78664, in Williamson County.
Who is the owner or developer of RABB HOUSE REDEVELOPMENT?
CITY OF ROUND ROCK is the property owner/developer of record for RABB HOUSE REDEVELOPMENT, per its TDLR project registration.
Who is the architect or design firm for RABB HOUSE REDEVELOPMENT?
KAHICKMAN ARCHITECTS is the design firm of record for RABB HOUSE REDEVELOPMENT, according to its TDLR filing.
How much does RABB HOUSE REDEVELOPMENT cost and how big is it?
RABB HOUSE REDEVELOPMENT has an estimated construction value of $1.5M, based on its TDLR filing.
๐Scope of Work
Construction of an approximately 3,600 square foot, split-level rental facility and associated site work/parking
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 26, 2012
Review Complete
Inspection Complete
Closed
Jun 1, 2013
๐Related Projects
๐คSame Owner
$912.7M total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
Drain replacement: Tunnel access to replace the remaining cast iron drain pipe for the kitchen sink main 4 shared drain for the back to back bathrooms. New toilet sweep . Connection to shower and tub drains. Replace beyond the existing cast iron to pvc connection under slab and correct the pitch removing flat/ back pitched pvc. Support the new pvc remain pipes to underside of slab.
New Irrigation
Express: 20 Exterior Breakouts 2 Access Holes 44 Bottom or base plates Additional Access Piers 10 44 Install beams 6 Sono tubes
Replacement of complete existing central heat and air system with or without duct work DOWNSTAIRS SYSTEM ONLY
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.
Property Owner
Design Firm
Williamson County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Williamson County
Find General Contractors in Williamson