Project intelligenceTDLR EABPRJB3803394Additions to Existing Building
Funding type

This project is privately funded, on private land for private use.

MERRIMAC, PHASE II

16749 STATE HWY. 105 EAST, Plantersville, TX, 77363

Construction complete · Apr 2013Project Closed

MERRIMAC, PHASE II is a additions to existing building project at 16749 STATE HWY. 105 EAST, Plantersville, in Grimes County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2013). The project has an estimated value of $1.7M.

Estimated project value
$1.7M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
5 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 1, 2012151 days across supplied datesApr 1, 2013

4 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    5 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    146 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77363 (Plantersville)

One email per change. Unsubscribe in one click. Privacy.

MERRIMAC, PHASE II is a Additions to Existing Building project located at 16749 STATE HWY. 105 EAST, Plantersville, TX 77363 in Plantersville, Texas. The project has an estimated value of $1.7M. MERRIMAC REAL ESTATE LLC is the property owner and HARDEY ENGINEERING is the design firm of record. The project was registered with TDLR on November 6, 2012.

Frequently Asked Questions

What is MERRIMAC, PHASE II?

MERRIMAC, PHASE II is a additions to existing building project at 16749 STATE HWY. 105 EAST in Plantersville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Phase II of EABPRJB2802228. This phase includes 24,000sf additional shop space, and freestanding, 5,000 sf sho

Is MERRIMAC, PHASE II open in Plantersville?

Construction on MERRIMAC, PHASE II is complete — TDLR records show the project passed its required accessibility inspection in Apr 2013. The building is finished and very likely open.

Where is MERRIMAC, PHASE II located?

MERRIMAC, PHASE II is located at 16749 STATE HWY. 105 EAST, Plantersville, TX, 77363, in Grimes County.

Who is the owner or developer of MERRIMAC, PHASE II?

MERRIMAC REAL ESTATE LLC is the property owner/developer of record for MERRIMAC, PHASE II, per its TDLR project registration.

Who is the architect or design firm for MERRIMAC, PHASE II?

HARDEY ENGINEERING is the design firm of record for MERRIMAC, PHASE II, according to its TDLR filing.

How much does MERRIMAC, PHASE II cost and how big is it?

MERRIMAC, PHASE II has an estimated construction value of $1.7M, based on its TDLR filing.

Scope of Work

Phase II of EABPRJB2802228. This phase includes 24,000sf additional shop space, and freestanding, 5,000 sf sho

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

16749 STATE HWY. 105 EAST, Plantersville, TX, 77363

Location by street address

Watch all construction in 77363 (Plantersville)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Plantersville?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.