Project intelligenceTDLR EABPRJB3804178Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

APACHE CHANUTE - FUEL SYSTEM REMOVAL in Houston, TX

17620 CHANUTE HANGAR, Houston, TX, 77032

Construction complete · Jun 2013Project Closed

APACHE CHANUTE - FUEL SYSTEM REMOVAL is a renovation/alteration project at 17620 CHANUTE HANGAR, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2013). The project has an estimated value of $400K.

Estimated project value
$400K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
6 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 20, 2012193 days across supplied datesJun 1, 2013

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    11 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    182 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77032 (Houston)

One email per change. Unsubscribe in one click. Privacy.

APACHE CHANUTE - FUEL SYSTEM REMOVAL is a Renovation/Alteration project located at 17620 CHANUTE HANGAR, Houston, TX 77032 in Houston, Texas. The project has an estimated value of $400K. CITY OF HOUSTON AIRPORT SYSTEM is the property owner and GENSLER is the design firm of record. The project was registered with TDLR on November 20, 2012.

Frequently Asked Questions

What is APACHE CHANUTE - FUEL SYSTEM REMOVAL?

APACHE CHANUTE - FUEL SYSTEM REMOVAL is a renovation/alteration project at 17620 CHANUTE HANGAR in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Private funds on public land - Demolish airside aircraftfueling system; tanks, fuel lines, equipment & fences w

Is APACHE CHANUTE - FUEL SYSTEM REMOVAL open in Houston?

Construction on APACHE CHANUTE - FUEL SYSTEM REMOVAL is complete — TDLR records show the project passed its required accessibility inspection in Jun 2013. The building is finished and very likely open.

Where is APACHE CHANUTE - FUEL SYSTEM REMOVAL located?

APACHE CHANUTE - FUEL SYSTEM REMOVAL is located at 17620 CHANUTE HANGAR, Houston, TX, 77032, in Harris County.

Who is the owner or developer of APACHE CHANUTE - FUEL SYSTEM REMOVAL?

CITY OF HOUSTON AIRPORT SYSTEM is the property owner/developer of record for APACHE CHANUTE - FUEL SYSTEM REMOVAL, per its TDLR project registration.

Who is the architect or design firm for APACHE CHANUTE - FUEL SYSTEM REMOVAL?

GENSLER is the design firm of record for APACHE CHANUTE - FUEL SYSTEM REMOVAL, according to its TDLR filing.

How much does APACHE CHANUTE - FUEL SYSTEM REMOVAL cost and how big is it?

APACHE CHANUTE - FUEL SYSTEM REMOVAL has an estimated construction value of $400K, based on its TDLR filing.

Scope of Work

Private funds on public land - Demolish airside aircraftfueling system; tanks, fuel lines, equipment & fences w

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

17620 CHANUTE HANGAR, Houston, TX, 77032

Loading location map…
29.97078, -95.35612

Watch all construction in 77032 (Houston)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.