Project intelligenceTDLR EABPRJB3805276Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

FANNIN ES STORMWATER POND in El Paso, TX

5425 SALEM DRIVE, El Paso, TX, 79924

Construction complete · Aug 2013Project Closed

FANNIN ES STORMWATER POND is a renovation/alteration project at 5425 SALEM DRIVE, El Paso, in El Paso County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2013). The project has an estimated value of $778K.

Estimated project value
$778K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Dec 11, 2012233 days across supplied datesAug 1, 2013

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    111 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    122 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79924 (El Paso)

One email per change. Unsubscribe in one click. Privacy.

FANNIN ES STORMWATER POND is a Renovation/Alteration project located at 5425 SALEM DRIVE, El Paso, TX 79924 in El Paso, Texas. The project has an estimated value of $778K. EL PASO INDEPENDENT SCHOOL DISTRICT is the property owner and QUANTUM ENGINEERING CONSULTANTS INC. is the design firm of record. The project was registered with TDLR on December 11, 2012.

Frequently Asked Questions

What is FANNIN ES STORMWATER POND?

FANNIN ES STORMWATER POND is a renovation/alteration project at 5425 SALEM DRIVE in El Paso, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New stormwater pond and site improvements for stormwaterdrainage.

Is FANNIN ES STORMWATER POND open in El Paso?

Construction on FANNIN ES STORMWATER POND is complete — TDLR records show the project passed its required accessibility inspection in Aug 2013. The building is finished and very likely open.

Where is FANNIN ES STORMWATER POND located?

FANNIN ES STORMWATER POND is located at 5425 SALEM DRIVE, El Paso, TX, 79924, in El Paso County.

Who is the owner or developer of FANNIN ES STORMWATER POND?

EL PASO INDEPENDENT SCHOOL DISTRICT is the property owner/developer of record for FANNIN ES STORMWATER POND, per its TDLR project registration.

Who is the architect or design firm for FANNIN ES STORMWATER POND?

QUANTUM ENGINEERING CONSULTANTS INC. is the design firm of record for FANNIN ES STORMWATER POND, according to its TDLR filing.

How much does FANNIN ES STORMWATER POND cost and how big is it?

FANNIN ES STORMWATER POND has an estimated construction value of $778K, based on its TDLR filing.

Scope of Work

New stormwater pond and site improvements for stormwaterdrainage.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

5425 SALEM DRIVE, El Paso, TX, 79924

Location by street address

Watch all construction in 79924 (El Paso)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.