VERTS
VERTS is a new construction project at 12800 GALLERIA CIRCLE Suite 101, Bee Cave, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2013). The project has an estimated value of $231K.
๐Project Metrics
TDLR #EABPRJB3805545Project Closed
Project has been completed and closed
VERTS is a New Construction project located at 12800 GALLERIA CIRCLE Suite 101, Bee Cave, TX 78737 in Bee Cave, Texas. The project has an estimated value of $231K. HILL COUNTRY GALLERIA LLC is the property owner and BARTUSH DESIGN LLC is the design firm of record. The project was registered with TDLR on December 17, 2012.
โFrequently Asked Questions
What is VERTS?
VERTS is a new construction project at 12800 GALLERIA CIRCLE Suite 101 in Bee Cave, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Restaurant Finish out of Commercial space in existing Building, that includes multple Commercial Suits.
Is VERTS open in Bee Cave?
Construction on VERTS is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2013. The building is finished and very likely open.
Where is VERTS located?
VERTS is located at 12800 GALLERIA CIRCLE Suite 101, Bee Cave, TX, 78737, in Travis County.
Who is the owner or developer of VERTS?
HILL COUNTRY GALLERIA LLC is the property owner/developer of record for VERTS, per its TDLR project registration.
Who is the architect or design firm for VERTS?
BARTUSH DESIGN LLC is the design firm of record for VERTS, according to its TDLR filing.
How much does VERTS cost and how big is it?
VERTS has an estimated construction value of $231K, based on its TDLR filing.
๐Scope of Work
Restaurant Finish out of Commercial space in existing Building, that includes multple Commercial Suits.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 17, 2012
Review Complete
Inspection Complete
Closed
Jan 1, 2013
๐Related Projects
๐คSame Owner
$12.4M total๐๏ธSame Design Firm
$1.9M total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
Replace house panel and combine 2 unit meters for remodel to single unit in ETJ *House panel meter is staying. CT meter is Unit 101
Provide electrical service for commercial space. EUD.
New commercial building (EUD)
Tenant finishout to exsting comm bldg only EUD (Unit #101)
Install Electric Service for tenant finish out. EUD
Property Owner
Design Firm
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Travis County
Find General Contractors in Travis