Project intelligenceTDLR EABPRJB3806776New Construction
Funding type

This project is privately funded, on private land for private use.

GRAPEVINE BANKING CENTER SOUTHWEST BANK

2050 HALL JOHNSON ROAD, Grapevine, TX, 76051

Construction complete · Feb 2014Project Closed

GRAPEVINE BANKING CENTER SOUTHWEST BANK is a new construction project at 2050 HALL JOHNSON ROAD, Grapevine, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2014). The project has an estimated value of $2.1M.

Estimated project value
$2.1M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
11 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 16, 2013381 days across supplied datesFeb 1, 2014

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    44 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    337 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76051 (Grapevine)

One email per change. Unsubscribe in one click. Privacy.

GRAPEVINE BANKING CENTER SOUTHWEST BANK is a New Construction project located at 2050 HALL JOHNSON ROAD, Grapevine, TX 76051 in Grapevine, Texas. The project has an estimated value of $2.1M. SOUTHWEST BANK is the property owner and HAHNFELD HOFFER STANFORD is the design firm of record. The project was registered with TDLR on January 16, 2013.

Frequently Asked Questions

What is GRAPEVINE BANKING CENTER SOUTHWEST BANK?

GRAPEVINE BANKING CENTER SOUTHWEST BANK is a new construction project at 2050 HALL JOHNSON ROAD in Grapevine, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: the construction of a new 2-story banking facility totaling approx 16,387 sf with offices, restrooms, bank lobby

Is GRAPEVINE BANKING CENTER SOUTHWEST BANK open in Grapevine?

Construction on GRAPEVINE BANKING CENTER SOUTHWEST BANK is complete — TDLR records show the project passed its required accessibility inspection in Feb 2014. The building is finished and very likely open.

Where is GRAPEVINE BANKING CENTER SOUTHWEST BANK located?

GRAPEVINE BANKING CENTER SOUTHWEST BANK is located at 2050 HALL JOHNSON ROAD, Grapevine, TX, 76051, in Tarrant County.

Who is the owner or developer of GRAPEVINE BANKING CENTER SOUTHWEST BANK?

SOUTHWEST BANK is the property owner/developer of record for GRAPEVINE BANKING CENTER SOUTHWEST BANK, per its TDLR project registration.

Who is the architect or design firm for GRAPEVINE BANKING CENTER SOUTHWEST BANK?

HAHNFELD HOFFER STANFORD is the design firm of record for GRAPEVINE BANKING CENTER SOUTHWEST BANK, according to its TDLR filing.

How much does GRAPEVINE BANKING CENTER SOUTHWEST BANK cost and how big is it?

GRAPEVINE BANKING CENTER SOUTHWEST BANK has an estimated construction value of $2.1M, based on its TDLR filing.

Scope of Work

the construction of a new 2-story banking facility totaling approx 16,387 sf with offices, restrooms, bank lobby

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

2050 HALL JOHNSON ROAD, Grapevine, TX, 76051

Loading location map…
32.89347, -97.09764

Watch all construction in 76051 (Grapevine)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Grapevine?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.