Project intelligenceTDLR EABPRJB3807327New Construction
Funding type

This project is privately funded, on private land for private use.

GATEWAY MEMORIAL CITY -ELEVATOR ADDITION in Houston, TX

947 GESSNER, Houston, TX, 77024

Construction complete · Mar 2014Project Closed

GATEWAY MEMORIAL CITY -ELEVATOR ADDITION is a new construction project at 947 GESSNER, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2014). The project has an estimated value of $200K.

Estimated project value
$200K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 1mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 24, 2013401 days across supplied datesMar 1, 2014

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    8 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    393 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77024 (Houston)

One email per change. Unsubscribe in one click. Privacy.

GATEWAY MEMORIAL CITY -ELEVATOR ADDITION is a New Construction project located at 947 GESSNER, Houston, TX 77024 in Houston, Texas. The project has an estimated value of $200K. METRONATIONAL is the property owner and MORRIS ARCHITECTS is the design firm of record. The project was registered with TDLR on January 24, 2013.

Frequently Asked Questions

What is GATEWAY MEMORIAL CITY -ELEVATOR ADDITION?

GATEWAY MEMORIAL CITY -ELEVATOR ADDITION is a new construction project at 947 GESSNER in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Adding an elevator for future tenant use.

Is GATEWAY MEMORIAL CITY -ELEVATOR ADDITION open in Houston?

Construction on GATEWAY MEMORIAL CITY -ELEVATOR ADDITION is complete — TDLR records show the project passed its required accessibility inspection in Mar 2014. The building is finished and very likely open.

Where is GATEWAY MEMORIAL CITY -ELEVATOR ADDITION located?

GATEWAY MEMORIAL CITY -ELEVATOR ADDITION is located at 947 GESSNER, Houston, TX, 77024, in Harris County.

Who is the owner or developer of GATEWAY MEMORIAL CITY -ELEVATOR ADDITION?

METRONATIONAL is the property owner/developer of record for GATEWAY MEMORIAL CITY -ELEVATOR ADDITION, per its TDLR project registration.

Who is the architect or design firm for GATEWAY MEMORIAL CITY -ELEVATOR ADDITION?

MORRIS ARCHITECTS is the design firm of record for GATEWAY MEMORIAL CITY -ELEVATOR ADDITION, according to its TDLR filing.

How much does GATEWAY MEMORIAL CITY -ELEVATOR ADDITION cost and how big is it?

GATEWAY MEMORIAL CITY -ELEVATOR ADDITION has an estimated construction value of $200K, based on its TDLR filing.

Scope of Work

Adding an elevator for future tenant use.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

947 GESSNER, Houston, TX, 77024

Loading location map…
29.78158, -95.54427

Watch all construction in 77024 (Houston)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.