BAKER HUGHES LEVEL 3 REMODEL
BAKER HUGHES LEVEL 3 REMODEL is a renovation/alteration project at 7000 HOLLISTER Suite 300, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2013). The project has an estimated value of $2.4M.
๐Project Metrics
TDLR #EABPRJB3809463Project Closed
Project has been completed and closed
BAKER HUGHES LEVEL 3 REMODEL is a Renovation/Alteration project located at 7000 HOLLISTER Suite 300, Houston, TX 77040 in Houston, Texas. The project has an estimated value of $2.4M. BAKER HUGHES OILFIELD OPERATIONS INC is the property owner and ENERGY ARCHITECTURE is the design firm of record. The project was registered with TDLR on March 4, 2013.
โFrequently Asked Questions
What is BAKER HUGHES LEVEL 3 REMODEL?
BAKER HUGHES LEVEL 3 REMODEL is a renovation/alteration project at 7000 HOLLISTER Suite 300 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior build out of lease space
Is BAKER HUGHES LEVEL 3 REMODEL open in Houston?
Construction on BAKER HUGHES LEVEL 3 REMODEL is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2013. The building is finished and very likely open.
Where is BAKER HUGHES LEVEL 3 REMODEL located?
BAKER HUGHES LEVEL 3 REMODEL is located at 7000 HOLLISTER Suite 300, Houston, TX, 77040, in Harris County.
Who is the owner or developer of BAKER HUGHES LEVEL 3 REMODEL?
BAKER HUGHES OILFIELD OPERATIONS INC is the property owner/developer of record for BAKER HUGHES LEVEL 3 REMODEL, per its TDLR project registration.
Who is the architect or design firm for BAKER HUGHES LEVEL 3 REMODEL?
ENERGY ARCHITECTURE is the design firm of record for BAKER HUGHES LEVEL 3 REMODEL, according to its TDLR filing.
How much does BAKER HUGHES LEVEL 3 REMODEL cost and how big is it?
BAKER HUGHES LEVEL 3 REMODEL has an estimated construction value of $2.4M, based on its TDLR filing.
๐Scope of Work
Interior build out of lease space
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 4, 2013
Review Complete
Inspection Complete
Closed
Aug 1, 2013