Project intelligenceTDLR EABPRJB3810254New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

BEAUMONT FIRE STATION #2 NORTH END

4990 HELBIG ROAD, Beaumont, TX, 77708

Construction complete · Oct 2014Project Closed

BEAUMONT FIRE STATION #2 NORTH END is a new construction project at 4990 HELBIG ROAD, Beaumont, in Jefferson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2014). The project has an estimated value of $3.2M.

Estimated project value
$3.2M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
11 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Sep 13, 2013383 days across supplied datesOct 1, 2014

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    49 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    334 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77708 (Beaumont)

One email per change. Unsubscribe in one click. Privacy.

BEAUMONT FIRE STATION #2 NORTH END is a New Construction project located at 4990 HELBIG ROAD, Beaumont, TX 77708 in Beaumont, Texas. The project has an estimated value of $3.2M. CITY OF BEAUMONT is the property owner and ARCHITECTURAL ALLIANCE INCORPORATED is the design firm of record. The project was registered with TDLR on September 13, 2013.

Frequently Asked Questions

What is BEAUMONT FIRE STATION #2 NORTH END?

BEAUMONT FIRE STATION #2 NORTH END is a new construction project at 4990 HELBIG ROAD in Beaumont, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New Construction-Fire Station-Cast-in-place foundation,Class A Steel, concrete masonry walls, brick veneer,tile

Is BEAUMONT FIRE STATION #2 NORTH END open in Beaumont?

Construction on BEAUMONT FIRE STATION #2 NORTH END is complete — TDLR records show the project passed its required accessibility inspection in Oct 2014. The building is finished and very likely open.

Where is BEAUMONT FIRE STATION #2 NORTH END located?

BEAUMONT FIRE STATION #2 NORTH END is located at 4990 HELBIG ROAD, Beaumont, TX, 77708, in Jefferson County.

Who is the owner or developer of BEAUMONT FIRE STATION #2 NORTH END?

CITY OF BEAUMONT is the property owner/developer of record for BEAUMONT FIRE STATION #2 NORTH END, per its TDLR project registration.

Who is the architect or design firm for BEAUMONT FIRE STATION #2 NORTH END?

ARCHITECTURAL ALLIANCE INCORPORATED is the design firm of record for BEAUMONT FIRE STATION #2 NORTH END, according to its TDLR filing.

How much does BEAUMONT FIRE STATION #2 NORTH END cost and how big is it?

BEAUMONT FIRE STATION #2 NORTH END has an estimated construction value of $3.2M, based on its TDLR filing.

Scope of Work

New Construction-Fire Station-Cast-in-place foundation,Class A Steel, concrete masonry walls, brick veneer,tile

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

4990 HELBIG ROAD, Beaumont, TX, 77708

30.12499, -94.13878

Watch all construction in 77708 (Beaumont)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Beaumont?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.