OD-AMBER OAKS BLDG. H FINISH OUT PHASE 3
OD-AMBER OAKS BLDG. H FINISH OUT PHASE 3 is a renovation/alteration project at 9501 AMBERGLEN BLVD., Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2013). The project has an estimated value of $1.0M.
๐Project Metrics
TDLR #EABPRJB3811462Project Closed
Project has been completed and closed
OD-AMBER OAKS BLDG. H FINISH OUT PHASE 3 is a Renovation/Alteration project located at 9501 AMBERGLEN BLVD., Austin, TX 78728 in Austin, Texas. The project has an estimated value of $1.0M. REO AMBER OAKS II LLC is the property owner and SBLM ARCHITECTS is the design firm of record. The project was registered with TDLR on April 8, 2013.
โFrequently Asked Questions
What is OD-AMBER OAKS BLDG. H FINISH OUT PHASE 3?
OD-AMBER OAKS BLDG. H FINISH OUT PHASE 3 is a renovation/alteration project at 9501 AMBERGLEN BLVD. in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Tenant finish out of the First-Zone B floor of an existing shell building to be used as office space. Existing S
Is OD-AMBER OAKS BLDG. H FINISH OUT PHASE 3 open in Austin?
Construction on OD-AMBER OAKS BLDG. H FINISH OUT PHASE 3 is complete โ TDLR records show the project passed its required accessibility inspection in May 2013. The building is finished and very likely open.
Where is OD-AMBER OAKS BLDG. H FINISH OUT PHASE 3 located?
OD-AMBER OAKS BLDG. H FINISH OUT PHASE 3 is located at 9501 AMBERGLEN BLVD., Austin, TX, 78728, in Travis County.
Who is the owner or developer of OD-AMBER OAKS BLDG. H FINISH OUT PHASE 3?
REO AMBER OAKS II LLC is the property owner/developer of record for OD-AMBER OAKS BLDG. H FINISH OUT PHASE 3, per its TDLR project registration.
Who is the architect or design firm for OD-AMBER OAKS BLDG. H FINISH OUT PHASE 3?
SBLM ARCHITECTS is the design firm of record for OD-AMBER OAKS BLDG. H FINISH OUT PHASE 3, according to its TDLR filing.
How much does OD-AMBER OAKS BLDG. H FINISH OUT PHASE 3 cost and how big is it?
OD-AMBER OAKS BLDG. H FINISH OUT PHASE 3 has an estimated construction value of $1.0M, based on its TDLR filing.
๐Scope of Work
Tenant finish out of the First-Zone B floor of an existing shell building to be used as office space. Existing S
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 8, 2013
Review Complete
Inspection Complete
Closed
May 1, 2013
๐Related Projects
๐คSame Owner
$1.9M total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
Replacement OSSF Septic for Parks and Rec Horticultural Staff.
Replacement OSSF Septic for Parks and Rec Horticultural Staff.
New single-story SFR (4br/2ba) with attached garage covered patio and covered porch EV charger is not optional. It is required per IECC 2024.
Freestone S353 C Right New - 1 Story SFR w/ 4 bedrooms 2 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
Construct new driveway approach of 18 FT and sidewalk of 44 LF
๐Related Site Plans
City of Austin site plan approvals at this location