IN-N-OUT BURGER
IN-N-OUT BURGER is a new construction project at 4508 N. IH-35, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2013). The project has an estimated value of $1.1M.
๐Project Metrics
TDLR #EABPRJB3811580Project Closed
Project has been completed and closed
IN-N-OUT BURGER is a New Construction project located at 4508 N. IH-35, Austin, TX 78722 in Austin, Texas. The project has an estimated value of $1.1M. GHA ARCHITECTURE/DEVELOPMENT is the property owner and GHA ARCHITECTURE/DEVELOPMENT is the design firm of record. The project was registered with TDLR on April 9, 2013.
โFrequently Asked Questions
What is IN-N-OUT BURGER?
IN-N-OUT BURGER is a new construction project at 4508 N. IH-35 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Ground up construction of a freestanding restaurant witha drive-thru.
Is IN-N-OUT BURGER open in Austin?
Construction on IN-N-OUT BURGER is complete โ TDLR records show the project passed its required accessibility inspection in Oct 2013. The building is finished and very likely open.
Where is IN-N-OUT BURGER located?
IN-N-OUT BURGER is located at 4508 N. IH-35, Austin, TX, 78722, in Travis County.
Who is the owner or developer of IN-N-OUT BURGER?
GHA ARCHITECTURE/DEVELOPMENT is the property owner/developer of record for IN-N-OUT BURGER, per its TDLR project registration.
Who is the architect or design firm for IN-N-OUT BURGER?
GHA ARCHITECTURE/DEVELOPMENT is the design firm of record for IN-N-OUT BURGER, according to its TDLR filing.
How much does IN-N-OUT BURGER cost and how big is it?
IN-N-OUT BURGER has an estimated construction value of $1.1M, based on its TDLR filing.
๐Scope of Work
Ground up construction of a freestanding restaurant witha drive-thru.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 9, 2013
Review Complete
Inspection Complete
Closed
Oct 1, 2013
๐Related Projects
๐คSame Owner
$201.5M total๐๏ธSame Design Firm
$201.5M total๐Related City Permits
Building permits found at or near this location
Express - Foundation Repair - Installing Steel Piers
Install Level 2 EV Charger
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3 Ton Gas Vertical
(Madhusudhan Saikiran) - INSTALLATION OF CIRCUIT FOR ELEC. VEHICLE CHARGING STATION - ESIP
Replacement of complete existing central heat and air system with or without duct work **JACKIE DAVIS: Remove and replace existing HVAC unit and install GLXS4024; no structural change.
Property Owner
Design Firm
Registered Accessibility Specialist
Travis County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Travis County
Find General Contractors in Travis