NORTH CAMPUS WORSHIP RENOVATION in Kingwood, TX

22770 HIGHWAY 59 N, Kingwood, TX, 77339

Construction complete · Jan 2015Project Closed

NORTH CAMPUS WORSHIP RENOVATION is a renovation/alteration project at 22770 HIGHWAY 59 N, Kingwood, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2015). The project has an estimated value of $1.5M.

Estimated project value
$1.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 7mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 15, 2013645 days across supplied datesJan 20, 2015

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    77 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    568 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77339 (Kingwood)

One email per change. Unsubscribe in one click. Privacy.

NORTH CAMPUS WORSHIP RENOVATION is a Renovation/Alteration project located at 22770 HIGHWAY 59 N, Kingwood, TX 77339 in Kingwood, Texas. The project has an estimated value of $1.5M. SECOND BAPTIST CHURCH is the property owner and KIRKSEY is the design firm of record. The project was registered with TDLR on April 15, 2013.

Frequently Asked Questions

What is NORTH CAMPUS WORSHIP RENOVATION?

NORTH CAMPUS WORSHIP RENOVATION is a renovation/alteration project at 22770 HIGHWAY 59 N in Kingwood, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovation of the worship center and worship platform

Is NORTH CAMPUS WORSHIP RENOVATION open in Kingwood?

Construction on NORTH CAMPUS WORSHIP RENOVATION is complete — TDLR records show the project passed its required accessibility inspection in Jan 2015. The building is finished and very likely open.

Where is NORTH CAMPUS WORSHIP RENOVATION located?

NORTH CAMPUS WORSHIP RENOVATION is located at 22770 HIGHWAY 59 N, Kingwood, TX, 77339, in Harris County.

Who is the owner or developer of NORTH CAMPUS WORSHIP RENOVATION?

SECOND BAPTIST CHURCH is the property owner/developer of record for NORTH CAMPUS WORSHIP RENOVATION, per its TDLR project registration.

Who is the architect or design firm for NORTH CAMPUS WORSHIP RENOVATION?

KIRKSEY is the design firm of record for NORTH CAMPUS WORSHIP RENOVATION, according to its TDLR filing.

How much does NORTH CAMPUS WORSHIP RENOVATION cost and how big is it?

NORTH CAMPUS WORSHIP RENOVATION has an estimated construction value of $1.5M, based on its TDLR filing.

Scope of Work

Interior renovation of the worship center and worship platform

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

22770 HIGHWAY 59 N, Kingwood, TX, 77339

Loading location map…
30.04571, -95.25315

Watch all construction in 77339 (Kingwood)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Kingwood?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.