Project intelligenceTDLR EABPRJB3812658Additions to Existing Building
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

GHOLSON ISD LOCKER ROOM ADDITION in Waco, TX

137 HAMILTON, Waco, TX, 76705

Construction complete · Aug 2013Project Closed

GHOLSON ISD LOCKER ROOM ADDITION is a additions to existing building project at 137 HAMILTON, Waco, in McLennan County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2013). The project has an estimated value of $475K.

Estimated project value
$475K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 27, 201396 days across supplied datesAug 1, 2013

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    4 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    92 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76705 (Waco)

One email per change. Unsubscribe in one click. Privacy.

GHOLSON ISD LOCKER ROOM ADDITION is a Additions to Existing Building project located at 137 HAMILTON, Waco, TX 76705 in Waco, Texas. The project has an estimated value of $475K. GHOLSON ISD is the property owner and ABACUS ENGINEERING INC. is the design firm of record. The project was registered with TDLR on April 27, 2013.

Frequently Asked Questions

What is GHOLSON ISD LOCKER ROOM ADDITION?

GHOLSON ISD LOCKER ROOM ADDITION is a additions to existing building project at 137 HAMILTON in Waco, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Building to include boys & girls locker rooms, restrooms, weight room and concession stand.

Is GHOLSON ISD LOCKER ROOM ADDITION open in Waco?

Construction on GHOLSON ISD LOCKER ROOM ADDITION is complete — TDLR records show the project passed its required accessibility inspection in Aug 2013. The building is finished and very likely open.

Where is GHOLSON ISD LOCKER ROOM ADDITION located?

GHOLSON ISD LOCKER ROOM ADDITION is located at 137 HAMILTON, Waco, TX, 76705, in McLennan County.

Who is the owner or developer of GHOLSON ISD LOCKER ROOM ADDITION?

GHOLSON ISD is the property owner/developer of record for GHOLSON ISD LOCKER ROOM ADDITION, per its TDLR project registration.

Who is the architect or design firm for GHOLSON ISD LOCKER ROOM ADDITION?

ABACUS ENGINEERING INC. is the design firm of record for GHOLSON ISD LOCKER ROOM ADDITION, according to its TDLR filing.

How much does GHOLSON ISD LOCKER ROOM ADDITION cost and how big is it?

GHOLSON ISD LOCKER ROOM ADDITION has an estimated construction value of $475K, based on its TDLR filing.

Scope of Work

Building to include boys & girls locker rooms, restrooms, weight room and concession stand.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

137 HAMILTON, Waco, TX, 76705

Loading location map…
31.71615, -97.23354

Watch all construction in 76705 (Waco)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.