Project intelligenceTDLR EABPRJB3813468Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

CP458734 MBB: RENO - ELLINGTON (3.448 & in Austin, TX

2500 SPEEDWAY, Austin, TX, 78712

Construction complete · Aug 2013Project Closed

CP458734 MBB: RENO - ELLINGTON (3.448 & is a renovation/alteration project at 2500 SPEEDWAY, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2013). The project has an estimated value of $115K.

Estimated project value
$115K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

May 1, 201392 days across supplied datesAug 1, 2013

4 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    9 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    83 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78712 (Austin)

One email per change. Unsubscribe in one click. Privacy.

CP458734 MBB: RENO - ELLINGTON (3.448 & is a Renovation/Alteration project located at 2500 SPEEDWAY, Austin, TX 78712 in Austin, Texas. The project has an estimated value of $115K. UNIVERSITY OF TEXAS AT AUSTIN, THE is the property owner and HDR ARCHITECTURE INC. is the design firm of record. The project was registered with TDLR on May 10, 2013.

Frequently Asked Questions

What is CP458734 MBB: RENO - ELLINGTON (3.448 &?

CP458734 MBB: RENO - ELLINGTON (3.448 & is a renovation/alteration project at 2500 SPEEDWAY in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Lab and office renovations of 3.448 & 3.456

Is CP458734 MBB: RENO - ELLINGTON (3.448 & open in Austin?

Construction on CP458734 MBB: RENO - ELLINGTON (3.448 & is complete — TDLR records show the project passed its required accessibility inspection in Aug 2013. The building is finished and very likely open.

Where is CP458734 MBB: RENO - ELLINGTON (3.448 & located?

CP458734 MBB: RENO - ELLINGTON (3.448 & is located at 2500 SPEEDWAY, Austin, TX, 78712, in Travis County.

Who is the owner or developer of CP458734 MBB: RENO - ELLINGTON (3.448 &?

UNIVERSITY OF TEXAS AT AUSTIN, THE is the property owner/developer of record for CP458734 MBB: RENO - ELLINGTON (3.448 &, per its TDLR project registration.

Who is the architect or design firm for CP458734 MBB: RENO - ELLINGTON (3.448 &?

HDR ARCHITECTURE INC. is the design firm of record for CP458734 MBB: RENO - ELLINGTON (3.448 &, according to its TDLR filing.

How much does CP458734 MBB: RENO - ELLINGTON (3.448 & cost and how big is it?

CP458734 MBB: RENO - ELLINGTON (3.448 & has an estimated construction value of $115K, based on its TDLR filing.

Scope of Work

Lab and office renovations of 3.448 & 3.456

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

2500 SPEEDWAY, Austin, TX, 78712

Loading location map…
30.28842, -97.73698

Related City Permits

Building permits found at or near this location

2500 SPRING CREEK DR
3.06 mi away

ePlan: Residential Expedited Review - New Autofill/Heated pool.

ActivePlumbing PermitNewOct 2026
View Details
2026-056509 PP
Protex Plumbing & Mechanical, LP
2500 BRIARGROVE DR
3.11 mi away

BASE: Installing a backup battery system and additional meter socket.

ActiveElectrical PermitAuxiliary PowerOct 2026
View Details
2026-128423 EP
Base Power
2500 BERKETT DR UNIT A
6.71 mi away

Replacement of an existing water heater 40 gallon water heater change out 2500 Berkett Dr A Austin TX 78745

ActivePlumbing PermitChange OutOct 2026
View Details
2026-132721 PP
Radiant Plumbing & AC
2500 S US 183 HWY SB UNIT 370

Bldg 3 Unit 370- NEW ABOVE-GROUND LP (PROPANE) GAS PIPING INSTALLATION COMMERCIAL ROASTING EQUIPMENT. This is a standalone new-work trade permit (gas piping) NOT a repair permit. No existing gas piping is being repaired replaced or altered; this is new piping to a newly installed appliance. PURPOSE: Install new above-ground LP gas piping to supply a commercial coffee roaster (IMF RM-15A_STD manufacturer data sheet Doc ST_00) inside the modular building at this address. Piping runs from the roasters gas train inlet connection to a new exterior termination stub at the rear exterior wall of the modular building. The exterior stub is a dead-end termination point only valved and capped for future connection by the propane supplier. Contractor scope ends at the exterior stub; it does NOT include the propane tank exterior regulators or any underground/trenched piping from the tank to the stub; that work is performed separately by the propane supply company. WORK DIMENSIONS: Total piping run approximately 25 to 35 feet (35 ft design basis) routed above ground through the rear interior of the modular building to an exterior wall penetration terminating at an exterior stub at the rear of the building. Pipe size: 3/4 in nominal Schedule 40 black steel trunk line reduced to 1/2 in NPT at the roasters gas train connection. Scope includes: pipe sizing and installation appliance shutoff valve at the roaster union sediment trap (drip leg) wall penetration with sleeve and seal exterior stub termination (valved and capped) pressure test and leak test of all new piping and coordination of required city inspections. No underground piping by the applicant. APPLIANCE DIMENSIONS AND SPECS (IMF RM-15A_STD data sheet): Overall dimensions 87.16 in L x 41.73 in W x 76.45 in H; weight 1433 lb (650 kg); burner Riello Gulliver BS1F LPG; maximum thermal input 178000 BTU/hr; LPG consumption 8.4 lb/hr; required inlet pressure minimum 12 in WC maximum 48 in WC; gas train connection 1/2 in; c

ActivePlumbing PermitRepairNov 2026
View Details
2026-132862 PP
Lalos Plumbing
2500 RIDGEPOINT DR

Like for Like repair to existing service

ActiveElectrical PermitRepairOct 2026
View Details
2026-134057 EP
Facility Solutions Group

Watch all construction in 78712 (Austin)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.