Project intelligenceTDLR EABPRJB3814746Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

KNIPPA DISTRICT WIDE IMPROVEMENT

100 KESSLER LANE, Knippa, TX, 78870

Construction complete · Aug 2014Project Closed

KNIPPA DISTRICT WIDE IMPROVEMENT is a renovation/alteration project at 100 KESSLER LANE, Knippa, in Uvalde County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2014). The project has an estimated value of $3.0M.

Estimated project value
$3.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 3, 2013424 days across supplied datesAug 1, 2014

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    59 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    365 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78870 (Knippa)

One email per change. Unsubscribe in one click. Privacy.

KNIPPA DISTRICT WIDE IMPROVEMENT is a Renovation/Alteration project located at 100 KESSLER LANE, Knippa, TX 78870 in Knippa, Texas. The project has an estimated value of $3.0M. KNIPPA INDEPENDENT SCHOOL DISTRICT is the property owner and SHW GROUP LLP is the design firm of record. The project was registered with TDLR on June 3, 2013.

Frequently Asked Questions

What is KNIPPA DISTRICT WIDE IMPROVEMENT?

KNIPPA DISTRICT WIDE IMPROVEMENT is a renovation/alteration project at 100 KESSLER LANE in Knippa, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The Project consists of renovations to the existing highschool building,a total of 12,600 SF. Renovated areas

Is KNIPPA DISTRICT WIDE IMPROVEMENT open in Knippa?

Construction on KNIPPA DISTRICT WIDE IMPROVEMENT is complete — TDLR records show the project passed its required accessibility inspection in Aug 2014. The building is finished and very likely open.

Where is KNIPPA DISTRICT WIDE IMPROVEMENT located?

KNIPPA DISTRICT WIDE IMPROVEMENT is located at 100 KESSLER LANE, Knippa, TX, 78870, in Uvalde County.

Who is the owner or developer of KNIPPA DISTRICT WIDE IMPROVEMENT?

KNIPPA INDEPENDENT SCHOOL DISTRICT is the property owner/developer of record for KNIPPA DISTRICT WIDE IMPROVEMENT, per its TDLR project registration.

Who is the architect or design firm for KNIPPA DISTRICT WIDE IMPROVEMENT?

SHW GROUP LLP is the design firm of record for KNIPPA DISTRICT WIDE IMPROVEMENT, according to its TDLR filing.

How much does KNIPPA DISTRICT WIDE IMPROVEMENT cost and how big is it?

KNIPPA DISTRICT WIDE IMPROVEMENT has an estimated construction value of $3.0M, based on its TDLR filing.

Scope of Work

The Project consists of renovations to the existing highschool building,a total of 12,600 SF. Renovated areas

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

100 KESSLER LANE, Knippa, TX, 78870

Loading location map…
29.29942, -99.63307

Watch all construction in 78870 (Knippa)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.