Project intelligenceTDLR EABPRJB3815848Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

KEYSTAFF TENANT FINISH-OUT in Austin, TX

2417 ASHDALE DR., Austin, TX, 78757

Construction complete · Sep 2013Project Closed

KEYSTAFF TENANT FINISH-OUT is a renovation/alteration project at 2417 ASHDALE DR., Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2013). The project has an estimated value of $175K.

Estimated project value
$175K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 20, 201373 days across supplied datesSep 1, 2013

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    11 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    62 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78757 (Austin)

One email per change. Unsubscribe in one click. Privacy.

KEYSTAFF TENANT FINISH-OUT is a Renovation/Alteration project located at 2417 ASHDALE DR., Austin, TX 78757 in Austin, Texas. The project has an estimated value of $175K. KEYSTAFF INC. is the property owner and MICHAEL HSU OFFICE OF ARCHITECTURE is the design firm of record. The project was registered with TDLR on June 20, 2013.

Frequently Asked Questions

What is KEYSTAFF TENANT FINISH-OUT?

KEYSTAFF TENANT FINISH-OUT is a renovation/alteration project at 2417 ASHDALE DR. in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Tenant finish out for an existing 1 story office shell space

Is KEYSTAFF TENANT FINISH-OUT open in Austin?

Construction on KEYSTAFF TENANT FINISH-OUT is complete — TDLR records show the project passed its required accessibility inspection in Sep 2013. The building is finished and very likely open.

Where is KEYSTAFF TENANT FINISH-OUT located?

KEYSTAFF TENANT FINISH-OUT is located at 2417 ASHDALE DR., Austin, TX, 78757, in Travis County.

Who is the owner or developer of KEYSTAFF TENANT FINISH-OUT?

KEYSTAFF INC. is the property owner/developer of record for KEYSTAFF TENANT FINISH-OUT, per its TDLR project registration.

Who is the architect or design firm for KEYSTAFF TENANT FINISH-OUT?

MICHAEL HSU OFFICE OF ARCHITECTURE is the design firm of record for KEYSTAFF TENANT FINISH-OUT, according to its TDLR filing.

How much does KEYSTAFF TENANT FINISH-OUT cost and how big is it?

KEYSTAFF TENANT FINISH-OUT has an estimated construction value of $175K, based on its TDLR filing.

Scope of Work

Tenant finish out for an existing 1 story office shell space

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

2417 ASHDALE DR., Austin, TX, 78757

Loading location map…
30.35875, -97.73061

Related City Permits

Building permits found at or near this location

2400 Ashdale Drive A 00000
109 ft away

Loop For Cable

FinalMechanical PermitJan 1983
View Details
1983-012067 MP
2400 Ashdale Drive A 00000
109 ft away

Loop For Cable

FinalElectrical PermitJan 1983
View Details
1983-012067 EP

Watch all construction in 78757 (Austin)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.