HEB AUSTIN 13 PHASE 2
HEB AUSTIN 13 PHASE 2 is a renovation/alteration project at 7112 ED BLUESTEIN BLVD, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2013). The project has an estimated value of $192K.
๐Project Metrics
TDLR #EABPRJB3815890Project Closed
Project has been completed and closed
HEB AUSTIN 13 PHASE 2 is a Renovation/Alteration project located at 7112 ED BLUESTEIN BLVD, Austin, TX 78723 in Austin, Texas. The project has an estimated value of $192K. HEB is the property owner and PETER LEWIS ARCHITECT + ASSOCIATES is the design firm of record. The project was registered with TDLR on June 20, 2013.
โFrequently Asked Questions
What is HEB AUSTIN 13 PHASE 2?
HEB AUSTIN 13 PHASE 2 is a renovation/alteration project at 7112 ED BLUESTEIN BLVD in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: renovations to existing business center and cooler
Is HEB AUSTIN 13 PHASE 2 open in Austin?
Construction on HEB AUSTIN 13 PHASE 2 is complete โ TDLR records show the project passed its required accessibility inspection in Oct 2013. The building is finished and very likely open.
Where is HEB AUSTIN 13 PHASE 2 located?
HEB AUSTIN 13 PHASE 2 is located at 7112 ED BLUESTEIN BLVD, Austin, TX, 78723, in Travis County.
Who is the owner or developer of HEB AUSTIN 13 PHASE 2?
HEB is the property owner/developer of record for HEB AUSTIN 13 PHASE 2, per its TDLR project registration.
Who is the architect or design firm for HEB AUSTIN 13 PHASE 2?
PETER LEWIS ARCHITECT + ASSOCIATES is the design firm of record for HEB AUSTIN 13 PHASE 2, according to its TDLR filing.
How much does HEB AUSTIN 13 PHASE 2 cost and how big is it?
HEB AUSTIN 13 PHASE 2 has an estimated construction value of $192K, based on its TDLR filing.
๐Scope of Work
renovations to existing business center and cooler
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 20, 2013
Review Complete
Inspection Complete
Closed
Oct 1, 2013
๐Related Projects
๐คSame Owner
$5.19B total๐Related City Permits
Building permits found at or near this location
Conversion of space to Chipotle Mexican Grill.
Replacement of complete existing central heat and air system with or without duct work
Wing Stop - Bluestein
Replacement of an existing water heater Replacement of NG Water Heater Like for Like
Making connection to existing wastewater line & installing pipe from connection to 5 outside proposed building