PUBLIC PARKING LOT MODIFICATIONS
PUBLIC PARKING LOT MODIFICATIONS is a renovation/alteration project at 2701 N. MAYS STREET, Round Rock, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2013). The project has an estimated value of $90K.
๐Project Metrics
TDLR #EABPRJB3816107Project Closed
Project has been completed and closed
PUBLIC PARKING LOT MODIFICATIONS is a Renovation/Alteration project located at 2701 N. MAYS STREET, Round Rock, TX 78665 in Round Rock, Texas. The project has an estimated value of $90K. CITY OF ROUND ROCK is the property owner and CITY OF ROUND ROCK is the design firm of record. The project was registered with TDLR on June 25, 2013.
โFrequently Asked Questions
What is PUBLIC PARKING LOT MODIFICATIONS?
PUBLIC PARKING LOT MODIFICATIONS is a renovation/alteration project at 2701 N. MAYS STREET in Round Rock, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remove existing approx. 15-space parking lot and re-locate/construct new 36-space parking lot for public/visitor
Is PUBLIC PARKING LOT MODIFICATIONS open in Round Rock?
Construction on PUBLIC PARKING LOT MODIFICATIONS is complete โ TDLR records show the project passed its required accessibility inspection in Sep 2013. The building is finished and very likely open.
Where is PUBLIC PARKING LOT MODIFICATIONS located?
PUBLIC PARKING LOT MODIFICATIONS is located at 2701 N. MAYS STREET, Round Rock, TX, 78665, in Williamson County.
Who is the owner or developer of PUBLIC PARKING LOT MODIFICATIONS?
CITY OF ROUND ROCK is the property owner/developer of record for PUBLIC PARKING LOT MODIFICATIONS, per its TDLR project registration.
Who is the architect or design firm for PUBLIC PARKING LOT MODIFICATIONS?
CITY OF ROUND ROCK is the design firm of record for PUBLIC PARKING LOT MODIFICATIONS, according to its TDLR filing.
How much does PUBLIC PARKING LOT MODIFICATIONS cost and how big is it?
PUBLIC PARKING LOT MODIFICATIONS has an estimated construction value of $90K, based on its TDLR filing.
๐Scope of Work
Remove existing approx. 15-space parking lot and re-locate/construct new 36-space parking lot for public/visitor
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 25, 2013
Review Complete
Inspection Complete
Closed
Sep 1, 2013
๐Related Projects
๐คSame Owner
$912.7M total๐๏ธSame Design Firm
$1.0M total๐Related City Permits
Building permits found at or near this location
Complete service change. Like for like.
Replacement of complete existing central heat and air system with or without duct work LANGLEY
Express- Remove and replace siding replace windows like for like. Replace front door. REVISION 1: Add EP
EXPRESS: Replace cast iron drains with PVC 2 bath valves 3 sink valves 2 toilet valves washing machine valve windows and exterior doors like for like
EXPRESS: Replace cast iron drains with PVC 2 bath valves 3 sink valves 2 toilet valves washing machine valve windows and exterior doors like for like