DR. SAINT LAURENT
DR. SAINT LAURENT is a renovation/alteration project at 12212 NORTHWEST FREEWAY Suite 350, Cypress, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2013). The project has an estimated value of $1.2M.
๐Project Metrics
TDLR #EABPRJB3816479Project Closed
Project has been completed and closed
DR. SAINT LAURENT is a Renovation/Alteration project located at 12212 NORTHWEST FREEWAY Suite 350, Cypress, TX 77429 in Cypress, Texas. The project has an estimated value of $1.2M. NORTH CYPRESS MEDICAL CENTER is the property owner and PHILIP EWALD ARCHITECTURE INC is the design firm of record. The project was registered with TDLR on July 1, 2013.
โFrequently Asked Questions
What is DR. SAINT LAURENT?
DR. SAINT LAURENT is a renovation/alteration project at 12212 NORTHWEST FREEWAY Suite 350 in Cypress, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: REMODEL OF OFFICE SPACE
Is DR. SAINT LAURENT open in Cypress?
Construction on DR. SAINT LAURENT is complete โ TDLR records show the project passed its required accessibility inspection in Nov 2013. The building is finished and very likely open.
Where is DR. SAINT LAURENT located?
DR. SAINT LAURENT is located at 12212 NORTHWEST FREEWAY Suite 350, Cypress, TX, 77429, in Harris County.
Who is the owner or developer of DR. SAINT LAURENT?
NORTH CYPRESS MEDICAL CENTER is the property owner/developer of record for DR. SAINT LAURENT, per its TDLR project registration.
Who is the architect or design firm for DR. SAINT LAURENT?
PHILIP EWALD ARCHITECTURE INC is the design firm of record for DR. SAINT LAURENT, according to its TDLR filing.
How much does DR. SAINT LAURENT cost and how big is it?
DR. SAINT LAURENT has an estimated construction value of $1.2M, based on its TDLR filing.
๐Scope of Work
REMODEL OF OFFICE SPACE
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 1, 2013
Review Complete
Inspection Complete
Closed
Nov 1, 2013