ENERGY XXI - LEVEL 26
ENERGY XXI - LEVEL 26 is a renovation/alteration project at 1021 MAIN STREET, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2013). The project has an estimated value of $675K.
๐Project Metrics
TDLR #EABPRJB3816905Project Closed
Project has been completed and closed
ENERGY XXI - LEVEL 26 is a Renovation/Alteration project located at 1021 MAIN STREET, Houston, TX 77002 in Houston, Texas. The project has an estimated value of $675K. BRI 1850 OCC LLC is the property owner and KIRKSEY ARCHITECTURE is the design firm of record. The project was registered with TDLR on July 10, 2013.
โFrequently Asked Questions
What is ENERGY XXI - LEVEL 26?
ENERGY XXI - LEVEL 26 is a renovation/alteration project at 1021 MAIN STREET in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 26th floor lease space alterations.
Is ENERGY XXI - LEVEL 26 open in Houston?
Construction on ENERGY XXI - LEVEL 26 is complete โ TDLR records show the project passed its required accessibility inspection in Oct 2013. The building is finished and very likely open.
Where is ENERGY XXI - LEVEL 26 located?
ENERGY XXI - LEVEL 26 is located at 1021 MAIN STREET, Houston, TX, 77002, in Harris County.
Who is the owner or developer of ENERGY XXI - LEVEL 26?
BRI 1850 OCC LLC is the property owner/developer of record for ENERGY XXI - LEVEL 26, per its TDLR project registration.
Who is the architect or design firm for ENERGY XXI - LEVEL 26?
KIRKSEY ARCHITECTURE is the design firm of record for ENERGY XXI - LEVEL 26, according to its TDLR filing.
How much does ENERGY XXI - LEVEL 26 cost and how big is it?
ENERGY XXI - LEVEL 26 has an estimated construction value of $675K, based on its TDLR filing.
๐Scope of Work
26th floor lease space alterations.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 10, 2013
Review Complete
Inspection Complete
Closed
Oct 1, 2013