Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
WILLIAMS DR IMPROVEMENTS PHASE 3 in Corpus Christi, TX
STAPLES ST. TO AIRLINE RD., Corpus Christi, TX, 78412
WILLIAMS DR IMPROVEMENTS PHASE 3 is a renovation/alteration project at STAPLES ST. TO AIRLINE RD., Corpus Christi, in Nueces County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2017). The project has an estimated value of $359K.
- Estimated project value
- $359K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- Not supplied
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- —
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 3y 11mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
133 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
1,399 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78412 (Corpus Christi)
One email per change. Unsubscribe in one click. Privacy.
WILLIAMS DR IMPROVEMENTS PHASE 3 is a Renovation/Alteration project located at STAPLES ST. TO AIRLINE RD., Corpus Christi, TX 78412 in Corpus Christi, Texas. The project has an estimated value of $359K. CITY OF CORPUS CHRISTI is the property owner and RVE INC. is the design firm of record. The project was registered with TDLR on August 21, 2013.
Frequently Asked Questions
What is WILLIAMS DR IMPROVEMENTS PHASE 3?
WILLIAMS DR IMPROVEMENTS PHASE 3 is a renovation/alteration project at STAPLES ST. TO AIRLINE RD. in Corpus Christi, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remove and replace existing sidewalks and curb ramps along Williams Dr. right of way from Staples St. to Airline
Is WILLIAMS DR IMPROVEMENTS PHASE 3 open in Corpus Christi?
Construction on WILLIAMS DR IMPROVEMENTS PHASE 3 is complete — TDLR records show the project passed its required accessibility inspection in Oct 2017. The building is finished and very likely open.
Where is WILLIAMS DR IMPROVEMENTS PHASE 3 located?
WILLIAMS DR IMPROVEMENTS PHASE 3 is located at STAPLES ST. TO AIRLINE RD., Corpus Christi, TX, 78412, in Nueces County.
Who is the owner or developer of WILLIAMS DR IMPROVEMENTS PHASE 3?
CITY OF CORPUS CHRISTI is the property owner/developer of record for WILLIAMS DR IMPROVEMENTS PHASE 3, per its TDLR project registration.
Who is the architect or design firm for WILLIAMS DR IMPROVEMENTS PHASE 3?
RVE INC. is the design firm of record for WILLIAMS DR IMPROVEMENTS PHASE 3, according to its TDLR filing.
How much does WILLIAMS DR IMPROVEMENTS PHASE 3 cost and how big is it?
WILLIAMS DR IMPROVEMENTS PHASE 3 has an estimated construction value of $359K, based on its TDLR filing.
Scope of Work
Remove and replace existing sidewalks and curb ramps along Williams Dr. right of way from Staples St. to Airline
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
STAPLES ST. TO AIRLINE RD., Corpus Christi, TX, 78412
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$652.9M totalWatch all construction in 78412 (Corpus Christi)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Corpus Christi?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.