ZENOSS - 1ST FLOOR REMODEL
ZENOSS - 1ST FLOOR REMODEL is a renovation/alteration project at 11305 FOUR POINTS DR. Suite 190, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2014). The project has an estimated value of $76K.
๐Project Metrics
TDLR #EABPRJB4801567Project Closed
Project has been completed and closed
ZENOSS - 1ST FLOOR REMODEL is a Renovation/Alteration project located at 11305 FOUR POINTS DR. Suite 190, Austin, TX 78724 in Austin, Texas. The project has an estimated value of $76K. BRANDYWINE REALTY TRUST is the property owner and KAMPFE DE STIJL is the design firm of record. The project was registered with TDLR on September 27, 2013.
โFrequently Asked Questions
What is ZENOSS - 1ST FLOOR REMODEL?
ZENOSS - 1ST FLOOR REMODEL is a renovation/alteration project at 11305 FOUR POINTS DR. Suite 190 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior Remodel
Is ZENOSS - 1ST FLOOR REMODEL open in Austin?
Construction on ZENOSS - 1ST FLOOR REMODEL is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2014. The building is finished and very likely open.
Where is ZENOSS - 1ST FLOOR REMODEL located?
ZENOSS - 1ST FLOOR REMODEL is located at 11305 FOUR POINTS DR. Suite 190, Austin, TX, 78724, in Travis County.
Who is the owner or developer of ZENOSS - 1ST FLOOR REMODEL?
BRANDYWINE REALTY TRUST is the property owner/developer of record for ZENOSS - 1ST FLOOR REMODEL, per its TDLR project registration.
Who is the architect or design firm for ZENOSS - 1ST FLOOR REMODEL?
KAMPFE DE STIJL is the design firm of record for ZENOSS - 1ST FLOOR REMODEL, according to its TDLR filing.
How much does ZENOSS - 1ST FLOOR REMODEL cost and how big is it?
ZENOSS - 1ST FLOOR REMODEL has an estimated construction value of $76K, based on its TDLR filing.
๐Scope of Work
Interior Remodel
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 27, 2013
Review Complete
Inspection Complete
Closed
Jan 1, 2014
๐Related Projects
๐คSame Owner
$216.1M total๐๏ธSame Design Firm
$100.6M total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
Replacement of an existing water heater Swapping out tankless water heater.
Construct new driveway approach of 17 FT and sidewalk of 21.25 LF
New 2 story single family residence 4 bed 2.5 bath covered porch 8 patio 2-car garage
New 2 story single family residence 4 bed 2.5 bath covered porch 8 patio 2-car garage
New 2 story single family residence 4 bed 2.5 bath covered porch 8 patio 2-car garage