Project intelligenceTDLR EABPRJB4803675Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

PHASE 1 AIRPORT AVE RECONSTRUCTION in Rosenberg, TX

FM 2218, Rosenberg, TX, 77471

Construction complete · Jul 2014Project Closed

PHASE 1 AIRPORT AVE RECONSTRUCTION is a renovation/alteration project at FM 2218, Rosenberg, in Fort Bend County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2014). The project has an estimated value of $2.2M.

Estimated project value
$2.2M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
6 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 1, 2013242 days across supplied datesJul 1, 2014

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    61 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    181 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77471 (Rosenberg)

One email per change. Unsubscribe in one click. Privacy.

PHASE 1 AIRPORT AVE RECONSTRUCTION is a Renovation/Alteration project located at FM 2218, Rosenberg, TX 77471 in Rosenberg, Texas. The project has an estimated value of $2.2M. CITY OF ROSENBERG is the property owner and COSTELLO INC is the design firm of record. The project was registered with TDLR on November 1, 2013.

Frequently Asked Questions

What is PHASE 1 AIRPORT AVE RECONSTRUCTION?

PHASE 1 AIRPORT AVE RECONSTRUCTION is a renovation/alteration project at FM 2218 in Rosenberg, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Reconstruction of street, public utilities, sidewalks, ramps and drainage improvements

Is PHASE 1 AIRPORT AVE RECONSTRUCTION open in Rosenberg?

Construction on PHASE 1 AIRPORT AVE RECONSTRUCTION is complete — TDLR records show the project passed its required accessibility inspection in Jul 2014. The building is finished and very likely open.

Where is PHASE 1 AIRPORT AVE RECONSTRUCTION located?

PHASE 1 AIRPORT AVE RECONSTRUCTION is located at FM 2218, Rosenberg, TX, 77471, in Fort Bend County.

Who is the owner or developer of PHASE 1 AIRPORT AVE RECONSTRUCTION?

CITY OF ROSENBERG is the property owner/developer of record for PHASE 1 AIRPORT AVE RECONSTRUCTION, per its TDLR project registration.

Who is the architect or design firm for PHASE 1 AIRPORT AVE RECONSTRUCTION?

COSTELLO INC is the design firm of record for PHASE 1 AIRPORT AVE RECONSTRUCTION, according to its TDLR filing.

How much does PHASE 1 AIRPORT AVE RECONSTRUCTION cost and how big is it?

PHASE 1 AIRPORT AVE RECONSTRUCTION has an estimated construction value of $2.2M, based on its TDLR filing.

Scope of Work

Reconstruction of street, public utilities, sidewalks, ramps and drainage improvements

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

FM 2218, Rosenberg, TX, 77471

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77471 (Rosenberg)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Rosenberg?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.