CAPITOL BEVERAGE
CAPITOL BEVERAGE is a new construction project at 13100 N FM ROAD 973 & 290, Manor, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2015). The project has an estimated value of $28.0M.
๐Project Metrics
TDLR #EABPRJB4805825Project Closed
Project has been completed and closed
CAPITOL BEVERAGE is a New Construction project located at 13100 N FM ROAD 973 & 290, Manor, TX 78653 in Manor, Texas. The project has an estimated value of $28.0M. EDWARD BUTLER is the property owner and HOLLERAN DUITSMAN ARCHITECTS is the design firm of record. The project was registered with TDLR on December 11, 2013.
โFrequently Asked Questions
What is CAPITOL BEVERAGE?
CAPITOL BEVERAGE is a new construction project at 13100 N FM ROAD 973 & 290 in Manor, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New Beer Distribution Warehouse and Office Buildings.
Is CAPITOL BEVERAGE open in Manor?
Construction on CAPITOL BEVERAGE is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2015. The building is finished and very likely open.
Where is CAPITOL BEVERAGE located?
CAPITOL BEVERAGE is located at 13100 N FM ROAD 973 & 290, Manor, TX, 78653, in Travis County.
Who is the owner or developer of CAPITOL BEVERAGE?
EDWARD BUTLER is the property owner/developer of record for CAPITOL BEVERAGE, per its TDLR project registration.
Who is the architect or design firm for CAPITOL BEVERAGE?
HOLLERAN DUITSMAN ARCHITECTS is the design firm of record for CAPITOL BEVERAGE, according to its TDLR filing.
How much does CAPITOL BEVERAGE cost and how big is it?
CAPITOL BEVERAGE has an estimated construction value of $28.0M, based on its TDLR filing.
๐Scope of Work
New Beer Distribution Warehouse and Office Buildings.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 11, 2013
Review Complete
Inspection Complete
Closed
Apr 1, 2015
๐Related Projects
๐คSame Owner
$73.0M total๐๏ธSame Design Firm
$84.0M total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
2026/04/28 - 2026/04/29 | Ticketed but public event for the community to see the World Cup trophy. - 700 slots/tickets per hour
2026/04/28 - 2026/04/29 | Ticketed but public event for the community to see the World Cup trophy. - 700 slots/tickets per hour
Reed - 39-77634 - Install new 5.76 kW rooftop solar system to existing residential only backfed breaker only.
Reed - 39-77634 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200 amp Main Breaker. Upgrading revenue meter to 200 Amps.
Install Sprinkler System
Property Owner
Design Firm
Travis County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Travis County
Find General Contractors in Travis