LESLIE'S SWIMMING POOL SUPPLIES #887 is a renovation/alteration project at 5145 N. FM 620 - STE L-150, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2014). The project has an estimated value of $150K.
Project has been completed and closed
LESLIE'S SWIMMING POOL SUPPLIES #887 is a Renovation/Alteration project located at 5145 N. FM 620 - STE L-150, Austin, TX 78732 in Austin, Texas. The project has an estimated value of $150K. PROPERTY DEVELOP. CEN. LLC is the property owner and WRIGHT GROUP ARCHITECTS is the design firm of record. The project was registered with TDLR on January 7, 2014.
LESLIE'S SWIMMING POOL SUPPLIES #887 is a renovation/alteration project at 5145 N. FM 620 - STE L-150 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 2,237 sqft interior finish-out.
Construction on LESLIE'S SWIMMING POOL SUPPLIES #887 is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2014. The building is finished and very likely open.
LESLIE'S SWIMMING POOL SUPPLIES #887 is located at 5145 N. FM 620 - STE L-150, Austin, TX, 78732, in Travis County.
PROPERTY DEVELOP. CEN. LLC is the property owner/developer of record for LESLIE'S SWIMMING POOL SUPPLIES #887, per its TDLR project registration.
WRIGHT GROUP ARCHITECTS is the design firm of record for LESLIE'S SWIMMING POOL SUPPLIES #887, according to its TDLR filing.
LESLIE'S SWIMMING POOL SUPPLIES #887 has an estimated construction value of $150K, based on its TDLR filing.
2,237 sqft interior finish-out.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jan 7, 2014
Review Complete
Inspection Complete
Closed
Apr 1, 2014
Building permits found at or near this location
Replacement of an existing water heater
Installing a New Meter in ETJ
New digital meter was not reading Austin energy sent a tech out to investigate AE tech found that the stinger wire was not terminated inside the meter can which was not required for old analog meters. AE gave client 72 hours shut down notice if repairs were not made client called us to make repairs. Repairs have been completed already. Repairs landing stinger wire to neutral lug inside meter can.
temp power for 5145 1/2 - ETJ
Installing 277/480 v 800 Amp for New Car Wash in the ETJ SP-2022-0121D