TCEA REMODEL is a renovation/alteration project at 3100 ALVIN DERANE Bldg B, Austin, TX 78741, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2014). The project has an estimated value of $2.0M.
Project has been completed and closed
TCEA REMODEL is a Renovation/Alteration project located at 3100 ALVIN DERANE Bldg B, Austin, TX 78741 in Austin, Texas. The project has an estimated value of $2.0M. TCEA is the property owner and KAMPFE DE STIJL is the design firm of record. The project was registered with TDLR on January 14, 2014.
TCEA REMODEL is a renovation/alteration project at 3100 ALVIN DERANE Bldg B, Austin, TX 78741 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel of existing space
Construction on TCEA REMODEL is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2014. The building is finished and very likely open.
TCEA REMODEL is located at 3100 ALVIN DERANE Bldg B, Austin, TX 78741, Austin, TX, 78741, in Travis County.
TCEA is the property owner/developer of record for TCEA REMODEL, per its TDLR project registration.
KAMPFE DE STIJL is the design firm of record for TCEA REMODEL, according to its TDLR filing.
TCEA REMODEL has an estimated construction value of $2.0M, based on its TDLR filing.
Remodel of existing space
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jan 14, 2014
Review Complete
Inspection Complete
Closed
Apr 1, 2014
Building permits found at or near this location
2754 StudioDZO TruDentistry Wall Sign East
2754 StudioDZO TruDentistry Wall Sign North
Installation of (2) dual port level 3 DCFC EV Chargers - City of Austin Fleet Mobility Services Department Electrification Infrastructure Phase 5 2026 032649 DA - Concurrent
Installation of (2) dual port level 3 DCFC EV Chargers - City of Austin Fleet Mobility Services Department Electrification Infrastructure Phase 5 2026 032649 DA - Concurrent
Replacement of Complete duct system only Replace existing Type 1 vent hood exhaust duct & supply-air ducting & replace with a new Type 1 vent hood that is exactly the same + install new fire wrap exhaust duct & supply-air ducting.