Project intelligenceTDLR EABPRJB4807810New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

TCESD #2 ADMIN. BUILDING FINISHOUT

201 EAST PECAN STREET, Pflugerville, TX, 78664

Construction complete · May 2014Project Closed

TCESD #2 ADMIN. BUILDING FINISHOUT is a new construction project at 201 EAST PECAN STREET, Pflugerville, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2014). The project has an estimated value of $185K.

Estimated project value
$185K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 22, 201499 days across supplied datesMay 1, 2014

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    10 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    89 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78664 (Pflugerville)

One email per change. Unsubscribe in one click. Privacy.

TCESD #2 ADMIN. BUILDING FINISHOUT is a New Construction project located at 201 EAST PECAN STREET, Pflugerville, TX 78664 in Pflugerville, Texas. The project has an estimated value of $185K. TCESD is the property owner and BRYAN EUWER is the design firm of record. The project was registered with TDLR on January 22, 2014.

Frequently Asked Questions

What is TCESD #2 ADMIN. BUILDING FINISHOUT?

TCESD #2 ADMIN. BUILDING FINISHOUT is a new construction project at 201 EAST PECAN STREET in Pflugerville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Partial finishout of existing second floor shell building

Is TCESD #2 ADMIN. BUILDING FINISHOUT open in Pflugerville?

Construction on TCESD #2 ADMIN. BUILDING FINISHOUT is complete — TDLR records show the project passed its required accessibility inspection in May 2014. The building is finished and very likely open.

Where is TCESD #2 ADMIN. BUILDING FINISHOUT located?

TCESD #2 ADMIN. BUILDING FINISHOUT is located at 201 EAST PECAN STREET, Pflugerville, TX, 78664, in Williamson County.

Who is the owner or developer of TCESD #2 ADMIN. BUILDING FINISHOUT?

TCESD is the property owner/developer of record for TCESD #2 ADMIN. BUILDING FINISHOUT, per its TDLR project registration.

Who is the architect or design firm for TCESD #2 ADMIN. BUILDING FINISHOUT?

BRYAN EUWER is the design firm of record for TCESD #2 ADMIN. BUILDING FINISHOUT, according to its TDLR filing.

How much does TCESD #2 ADMIN. BUILDING FINISHOUT cost and how big is it?

TCESD #2 ADMIN. BUILDING FINISHOUT has an estimated construction value of $185K, based on its TDLR filing.

Scope of Work

Partial finishout of existing second floor shell building

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

201 EAST PECAN STREET, Pflugerville, TX, 78664

30.43941, -97.62000

Related City Permits

Building permits found at or near this location

2014 E 10TH ST
13.43 mi away

New pool for single family use. With plumbing permit.

ActivePlumbing PermitNewSep 2026
View Details
2026-007422 PP
Local Plumbing Service-DBA Crow's Plumbing Service
201 LAURELWOOD TRL

SERVICE UPGRADE 200AMP

ActiveElectrical PermitUpgradeSep 2026
View Details
2026-116518 EP
American Residential Services LLC
2011 E 6TH ST BLDG 7 UNIT 7220

Replacement of complete existing central heat and air system with or without duct work

ActiveMechanical PermitChange OutSep 2026
View Details
2026-112024 MP
Texas Multifamily Solution, LLC
2014 KAREN AVE BLDG 2

Bldg 2 New Construction of 2-Story SF Res [5bed 4bath] with attached garage

ActiveElectrical PermitNewSep 2026
View Details
2026-112560 EP
DeLuna Electrical Services, LLC
2014 KAREN AVE BLDG 1

Plan: Residential Expedited Review - Three Unit- Bldg 1New Construction of 2-Story SF Res [4bed 4bath] with attached garage

ActiveElectrical PermitNewSep 2026
View Details
2026-112559 EP
DeLuna Electrical Services, LLC

Watch all construction in 78664 (Pflugerville)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Pflugerville?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.