SH 34
SH 34 is a new construction project at US 175, Kaufman, in Kaufman County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2016). The project has an estimated value of $24.4M.
๐Project Metrics
TDLR #EABPRJB4807907Project Closed
Project has been completed and closed
SH 34 is a New Construction project located at US 175, Kaufman, TX 75142 in Kaufman, Texas. The project has an estimated value of $24.4M. TX DOT DISTRICT: DALLAS is the property owner and TX DEPT OF TRANSPORTATION is the design firm of record. The project was registered with TDLR on January 22, 2014.
โFrequently Asked Questions
What is SH 34?
SH 34 is a new construction project at US 175 in Kaufman, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of roadway, sidewalks and ADA ramps, consisting of grading, base, pavement drainage facilities
Is SH 34 open in Kaufman?
Construction on SH 34 is complete โ TDLR records show the project passed its required accessibility inspection in Sep 2016. The building is finished and very likely open.
Where is SH 34 located?
SH 34 is located at US 175, Kaufman, TX, 75142, in Kaufman County.
Who is the owner or developer of SH 34?
TX DOT DISTRICT: DALLAS is the property owner/developer of record for SH 34, per its TDLR project registration.
Who is the architect or design firm for SH 34?
TX DEPT OF TRANSPORTATION is the design firm of record for SH 34, according to its TDLR filing.
How much does SH 34 cost and how big is it?
SH 34 has an estimated construction value of $24.4M, based on its TDLR filing.
๐Scope of Work
Construction of roadway, sidewalks and ADA ramps, consisting of grading, base, pavement drainage facilities
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 22, 2014
Review Complete
Inspection Complete
Closed
Sep 30, 2016
๐Related Projects
๐คSame Owner
$37.03B total๐๏ธSame Design Firm
$37.03B totalProperty Owner
Design Firm
Kaufman County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Kaufman County
Find General Contractors in Kaufman