HUTTO SOUTH WASTEWATER TREATMENT PLANT
๐Project Metrics
TDLR #EABPRJB4808297Project Closed
Project has been completed and closed
๐Scope of Work
The Blower and Electrical Building is the only accessible building. The other structures on this Wastewater cam
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐๏ธSame Design Firm
$7.7M total๐Related City Permits
Building permits found at or near this location
Express- Remove and replace 14 windows like for like; no structural change.
26kW whole home generator (Natural Gas) connected to house meter and main panel. PEC disconnect required. (Paul Vineis)
Replace interior hot and cold water lines with Uponor PEx pipe. Replace main water line from city lead to home.
Replace interior hot and cold water lines with Uponor PEX pipe. Replace main water line from city lead to home.
Tenant improvement of an existing shell space for a f Hounds Town dog daycare facility