UTMB B73 HELIUM RECOVERY
UTMB B73 HELIUM RECOVERY is a renovation/alteration project at 724 HARBORSIDE DRIVE, Galveston, in Galveston County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2015). The project has an estimated value of $85K.
๐Project Metrics
TDLR #EABPRJB4808816Project Closed
Project has been completed and closed
UTMB B73 HELIUM RECOVERY is a Renovation/Alteration project located at 724 HARBORSIDE DRIVE, Galveston, TX 77550 in Galveston, Texas. The project has an estimated value of $85K. BOARD OF REGENTS OF THE UT SYSTEM, THE is the property owner and PAGE is the design firm of record. The project was registered with TDLR on February 6, 2014.
โFrequently Asked Questions
What is UTMB B73 HELIUM RECOVERY?
UTMB B73 HELIUM RECOVERY is a renovation/alteration project at 724 HARBORSIDE DRIVE in Galveston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Installation of Owner provided lab equipment and utilities/construction to serve them.
Is UTMB B73 HELIUM RECOVERY open in Galveston?
Construction on UTMB B73 HELIUM RECOVERY is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2015. The building is finished and very likely open.
Where is UTMB B73 HELIUM RECOVERY located?
UTMB B73 HELIUM RECOVERY is located at 724 HARBORSIDE DRIVE, Galveston, TX, 77550, in Galveston County.
Who is the owner or developer of UTMB B73 HELIUM RECOVERY?
BOARD OF REGENTS OF THE UT SYSTEM, THE is the property owner/developer of record for UTMB B73 HELIUM RECOVERY, per its TDLR project registration.
Who is the architect or design firm for UTMB B73 HELIUM RECOVERY?
PAGE is the design firm of record for UTMB B73 HELIUM RECOVERY, according to its TDLR filing.
How much does UTMB B73 HELIUM RECOVERY cost and how big is it?
UTMB B73 HELIUM RECOVERY has an estimated construction value of $85K, based on its TDLR filing.
๐Scope of Work
Installation of Owner provided lab equipment and utilities/construction to serve them.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Feb 6, 2014
Review Complete
Inspection Complete
Closed
Apr 30, 2015