SATEN COFFEE
SATEN COFFEE is a renovation/alteration project at 916 SPRINGDALE ROAD Building 3, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2014). The project has an estimated value of $217K.
๐Project Metrics
TDLR #EABPRJB4809496Project Closed
Project has been completed and closed
SATEN COFFEE is a Renovation/Alteration project located at 916 SPRINGDALE ROAD Building 3, Austin, TX 78702 in Austin, Texas. The project has an estimated value of $217K. BLUEDALE LLC is the property owner and WEISS ARCHITECTURE is the design firm of record. The project was registered with TDLR on February 19, 2014.
โFrequently Asked Questions
What is SATEN COFFEE?
SATEN COFFEE is a renovation/alteration project at 916 SPRINGDALE ROAD Building 3 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Tenant finish out of existing building. Small coffee shop and lounge
Is SATEN COFFEE open in Austin?
Construction on SATEN COFFEE is complete โ TDLR records show the project passed its required accessibility inspection in Jul 2014. The building is finished and very likely open.
Where is SATEN COFFEE located?
SATEN COFFEE is located at 916 SPRINGDALE ROAD Building 3, Austin, TX, 78702, in Travis County.
Who is the owner or developer of SATEN COFFEE?
BLUEDALE LLC is the property owner/developer of record for SATEN COFFEE, per its TDLR project registration.
Who is the architect or design firm for SATEN COFFEE?
WEISS ARCHITECTURE is the design firm of record for SATEN COFFEE, according to its TDLR filing.
How much does SATEN COFFEE cost and how big is it?
SATEN COFFEE has an estimated construction value of $217K, based on its TDLR filing.
๐Scope of Work
Tenant finish out of existing building. Small coffee shop and lounge
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Feb 19, 2014
Review Complete
Inspection Complete
Closed
Jul 1, 2014
๐Related Projects
๐คSame Owner
$582K total๐Related City Permits
Building permits found at or near this location
Express - Foundation Repair Duplicate Submittal
Express- Foundation Repair
Total demo of a SFR 1309 sq ft built 1930 / Total demo of a ADU 1185 sq ft built 1930 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage. ***
Replacement of an existing water heater Replace 40-gallon gas water heater Located in garage
ROOFTOP SOLAR WITH BACKUP BATTERY ONCOR Energy