HEB BASTROP EXPANSION
HEB BASTROP EXPANSION is a additions to existing building project at 104 NORTH HASLER BOULVARD, Bastrop, in Bastrop County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2014). The project has an estimated value of $7.1M.
๐Project Metrics
TDLR #EABPRJB4810239Project Closed
Project has been completed and closed
HEB BASTROP EXPANSION is a Additions to Existing Building project located at 104 NORTH HASLER BOULVARD, Bastrop, TX 78602 in Bastrop, Texas. The project has an estimated value of $7.1M. HEB GROCERY COMPANY is the property owner and SELSER SCHAEFER ARCHITECTS is the design firm of record. The project was registered with TDLR on March 4, 2014.
โFrequently Asked Questions
What is HEB BASTROP EXPANSION?
HEB BASTROP EXPANSION is a additions to existing building project at 104 NORTH HASLER BOULVARD in Bastrop, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Expansion to Existing HEB
Is HEB BASTROP EXPANSION open in Bastrop?
Construction on HEB BASTROP EXPANSION is complete โ TDLR records show the project passed its required accessibility inspection in Nov 2014. The building is finished and very likely open.
Where is HEB BASTROP EXPANSION located?
HEB BASTROP EXPANSION is located at 104 NORTH HASLER BOULVARD, Bastrop, TX, 78602, in Bastrop County.
Who is the owner or developer of HEB BASTROP EXPANSION?
HEB GROCERY COMPANY is the property owner/developer of record for HEB BASTROP EXPANSION, per its TDLR project registration.
Who is the architect or design firm for HEB BASTROP EXPANSION?
SELSER SCHAEFER ARCHITECTS is the design firm of record for HEB BASTROP EXPANSION, according to its TDLR filing.
How much does HEB BASTROP EXPANSION cost and how big is it?
HEB BASTROP EXPANSION has an estimated construction value of $7.1M, based on its TDLR filing.
๐Scope of Work
Expansion to Existing HEB
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 4, 2014
Review Complete
Inspection Complete
Closed
Nov 1, 2014
๐Related Projects
๐คSame Owner
$5.19B total๐Related City Permits
Building permits found at or near this location
Express - Replace 7Existing windows - size for size Replace 1 existing entry door
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work HVAC CHANGE OUT
Express- Tub to shower conversion in master bathroom. Replace walls in shower. Replace ceiling fan in master bedroom.
Replacement of complete existing central heat and air system with or without duct work HVAC changeout: Replace existing 3-ton horizontal heat-pump HVAC system with a like-for-like unit . No structural change.