WENDY'S 2054 is a renovation/alteration project at 4001, I-35 SOUTH, San Marcos, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2014). The project has an estimated value of $90K.
Project has been completed and closed
WENDY'S 2054 is a Renovation/Alteration project located at 4001, I-35 SOUTH, San Marcos, TX 78666 in San Marcos, Texas. The project has an estimated value of $90K. WENDY'S #10 is the property owner and Q C DESIGN is the design firm of record. The project was registered with TDLR on March 11, 2014.
WENDY'S 2054 is a renovation/alteration project at 4001, I-35 SOUTH in San Marcos, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel exterior and interior of existing Wendy's.
Construction on WENDY'S 2054 is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2014. The building is finished and very likely open.
WENDY'S 2054 is located at 4001, I-35 SOUTH, San Marcos, TX, 78666, in Hays County.
WENDY'S #10 is the property owner/developer of record for WENDY'S 2054, per its TDLR project registration.
Q C DESIGN is the design firm of record for WENDY'S 2054, according to its TDLR filing.
WENDY'S 2054 has an estimated construction value of $90K, based on its TDLR filing.
Remodel exterior and interior of existing Wendy's.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Mar 11, 2014
Review Complete
Inspection Complete
Closed
Dec 1, 2014
Building permits found at or near this location
Express: Replacing 4 windows (like for like)
This estimate is to perform a 15 foot sewer repair on the main 4 inch PVC sewer line. Allstate plumbing will utilize a subcontractor to perform the excavation once the tunnel has been fully excavated Our technicians will perform the repairs either the same day or following day. Every 4 foot of pipe there will be hangers to help keep the pipe secured to the underside of the slab and prevent breakage or damage in the future. Once the repair has been complete an inspection will need to be performed by a state verified plumbing inspector. The tunnel cannot be backfilled until the repair passes inspection. On the day of the repair our plumbers on site will perform a hydrostatic test to ensure a leak free repair. If our technicians find other areas in need of repair while underneath the home further estimates will be provided. If the excavation crew needs to perform further structural repair on the slab or runs into any unforeseen issues further estimates will be provided. Allstate plumbing/excavation crew is not responsible for any landscaping.
Interior remodel (bath remodels kitchen remodel new floors drywall repair paint etc). converting covered patio to sunroom and building an exterior deck.
Replacement of complete existing central heat and air system with or without duct work