Project intelligenceTDLR EABPRJB4813552Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

WEATHERFORD ISD MULTI-CAMPUS RENO MMES

719 OAKRIDGE DR, Weatherford, TX, 76086

Construction complete · Aug 2014Project Closed

WEATHERFORD ISD MULTI-CAMPUS RENO MMES is a renovation/alteration project at 719 OAKRIDGE DR, Weatherford, in Parker County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2014). The project has an estimated value of $240K.

Estimated project value
$240K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 22, 2014101 days across supplied datesAug 1, 2014

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    9 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    92 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76086 (Weatherford)

One email per change. Unsubscribe in one click. Privacy.

WEATHERFORD ISD MULTI-CAMPUS RENO MMES is a Renovation/Alteration project located at 719 OAKRIDGE DR, Weatherford, TX 76086 in Weatherford, Texas. The project has an estimated value of $240K. WEATHERFORD ISD is the property owner and HUCKABEE & ASSOCIATES INC. is the design firm of record. The project was registered with TDLR on April 22, 2014.

Frequently Asked Questions

What is WEATHERFORD ISD MULTI-CAMPUS RENO MMES?

WEATHERFORD ISD MULTI-CAMPUS RENO MMES is a renovation/alteration project at 719 OAKRIDGE DR in Weatherford, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior cosmetic renovation - finishes only; plus playground fencing.

Is WEATHERFORD ISD MULTI-CAMPUS RENO MMES open in Weatherford?

Construction on WEATHERFORD ISD MULTI-CAMPUS RENO MMES is complete — TDLR records show the project passed its required accessibility inspection in Aug 2014. The building is finished and very likely open.

Where is WEATHERFORD ISD MULTI-CAMPUS RENO MMES located?

WEATHERFORD ISD MULTI-CAMPUS RENO MMES is located at 719 OAKRIDGE DR, Weatherford, TX, 76086, in Parker County.

Who is the owner or developer of WEATHERFORD ISD MULTI-CAMPUS RENO MMES?

WEATHERFORD ISD is the property owner/developer of record for WEATHERFORD ISD MULTI-CAMPUS RENO MMES, per its TDLR project registration.

Who is the architect or design firm for WEATHERFORD ISD MULTI-CAMPUS RENO MMES?

HUCKABEE & ASSOCIATES INC. is the design firm of record for WEATHERFORD ISD MULTI-CAMPUS RENO MMES, according to its TDLR filing.

How much does WEATHERFORD ISD MULTI-CAMPUS RENO MMES cost and how big is it?

WEATHERFORD ISD MULTI-CAMPUS RENO MMES has an estimated construction value of $240K, based on its TDLR filing.

Scope of Work

Interior cosmetic renovation - finishes only; plus playground fencing.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

719 OAKRIDGE DR, Weatherford, TX, 76086

32.77379, -97.71508

Watch all construction in 76086 (Weatherford)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Weatherford?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.