LOCKER ROOM
LOCKER ROOM is a renovation/alteration project at 6301 NW I 410 LOOK #VC11A, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2014). The project has an estimated value of $100K.
๐Project Metrics
TDLR #EABPRJB4814169Project Closed
Project has been completed and closed
LOCKER ROOM is a Renovation/Alteration project located at 6301 NW I 410 LOOK #VC11A, San Antonio, TX 78238 in San Antonio, Texas. The project has an estimated value of $100K. SIMON PROPERTIES is the property owner and LINEAR ARCHITECTURE is the design firm of record. The project was registered with TDLR on April 30, 2014.
โFrequently Asked Questions
What is LOCKER ROOM?
LOCKER ROOM is a renovation/alteration project at 6301 NW I 410 LOOK #VC11A in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: An interior finish out combining two existing lease spaces for a retail space.
Is LOCKER ROOM open in San Antonio?
Construction on LOCKER ROOM is complete โ TDLR records show the project passed its required accessibility inspection in Jul 2014. The building is finished and very likely open.
Where is LOCKER ROOM located?
LOCKER ROOM is located at 6301 NW I 410 LOOK #VC11A, San Antonio, TX, 78238, in Bexar County.
Who is the owner or developer of LOCKER ROOM?
SIMON PROPERTIES is the property owner/developer of record for LOCKER ROOM, per its TDLR project registration.
Who is the architect or design firm for LOCKER ROOM?
LINEAR ARCHITECTURE is the design firm of record for LOCKER ROOM, according to its TDLR filing.
How much does LOCKER ROOM cost and how big is it?
LOCKER ROOM has an estimated construction value of $100K, based on its TDLR filing.
๐Scope of Work
An interior finish out combining two existing lease spaces for a retail space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 30, 2014
Review Complete
Inspection Complete
Closed
Jul 1, 2014