TERMINAL B PHASES 2 AND 3 IFC
TERMINAL B PHASES 2 AND 3 IFC is a renovation/alteration project at 3200 EAST AIRFIELD DRIVE, Dfw Airport, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2018). The project has an estimated value of $50.0M.
๐Project Metrics
TDLR #EABPRJB4816534Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes โ permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75261 (Dfw Airport)
One email per change. Unsubscribe in one click. Privacy.
TERMINAL B PHASES 2 AND 3 IFC is a Renovation/Alteration project located at 3200 EAST AIRFIELD DRIVE, Dfw Airport, TX 75261 in Dfw Airport, Texas. The project has an estimated value of $50.0M. AIRPORT DEVELOPMENT & ENGINEERING DEPT. is the property owner and CORGAN ASSOCIATES is the design firm of record. The project was registered with TDLR on June 5, 2014.
โFrequently Asked Questions
What is TERMINAL B PHASES 2 AND 3 IFC?
TERMINAL B PHASES 2 AND 3 IFC is a renovation/alteration project at 3200 EAST AIRFIELD DRIVE in Dfw Airport, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior remodel of terminal of multiple areas on multiple levels of building.
Is TERMINAL B PHASES 2 AND 3 IFC open in Dfw Airport?
Construction on TERMINAL B PHASES 2 AND 3 IFC is complete โ TDLR records show the project passed its required accessibility inspection in May 2018. The building is finished and very likely open.
Where is TERMINAL B PHASES 2 AND 3 IFC located?
TERMINAL B PHASES 2 AND 3 IFC is located at 3200 EAST AIRFIELD DRIVE, Dfw Airport, TX, 75261, in Dallas County.
Who is the owner or developer of TERMINAL B PHASES 2 AND 3 IFC?
AIRPORT DEVELOPMENT & ENGINEERING DEPT. is the property owner/developer of record for TERMINAL B PHASES 2 AND 3 IFC, per its TDLR project registration.
Who is the architect or design firm for TERMINAL B PHASES 2 AND 3 IFC?
CORGAN ASSOCIATES is the design firm of record for TERMINAL B PHASES 2 AND 3 IFC, according to its TDLR filing.
How much does TERMINAL B PHASES 2 AND 3 IFC cost and how big is it?
TERMINAL B PHASES 2 AND 3 IFC has an estimated construction value of $50.0M, based on its TDLR filing.
๐Scope of Work
Interior remodel of terminal of multiple areas on multiple levels of building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 5, 2014
Review Complete
Inspection Complete
Closed
May 30, 2018
๐Related Projects
๐คSame Owner
$55.0M totalProperty Owner
Design Firm
Dallas County Economy
Explore Area
Watch all construction in 75261 (Dfw Airport)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.