Project intelligenceTDLR EABPRJB4816630Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

MAIN STREET CURB REPLACEMENT PROJECT in Houston, TX

1900 MAIN STREET, Houston, TX, 77002

Construction complete · Sep 2014Project Closed

MAIN STREET CURB REPLACEMENT PROJECT is a renovation/alteration project at 1900 MAIN STREET, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2014). The project has an estimated value of $66K.

Estimated project value
$66K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 6, 201487 days across supplied datesSep 1, 2014

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    56 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    31 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77002 (Houston)

One email per change. Unsubscribe in one click. Privacy.

MAIN STREET CURB REPLACEMENT PROJECT is a Renovation/Alteration project located at 1900 MAIN STREET, Houston, TX 77002 in Houston, Texas. The project has an estimated value of $66K. METROPOLITAN TRANSIT AUTHORITY is the property owner and AIA ENGINEERS LTD is the design firm of record. The project was registered with TDLR on June 6, 2014.

Frequently Asked Questions

What is MAIN STREET CURB REPLACEMENT PROJECT?

MAIN STREET CURB REPLACEMENT PROJECT is a renovation/alteration project at 1900 MAIN STREET in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replacement of the Curb Ramps at the corner of Pierce and Main Street and St Joseph at Main Street

Is MAIN STREET CURB REPLACEMENT PROJECT open in Houston?

Construction on MAIN STREET CURB REPLACEMENT PROJECT is complete — TDLR records show the project passed its required accessibility inspection in Sep 2014. The building is finished and very likely open.

Where is MAIN STREET CURB REPLACEMENT PROJECT located?

MAIN STREET CURB REPLACEMENT PROJECT is located at 1900 MAIN STREET, Houston, TX, 77002, in Harris County.

Who is the owner or developer of MAIN STREET CURB REPLACEMENT PROJECT?

METROPOLITAN TRANSIT AUTHORITY is the property owner/developer of record for MAIN STREET CURB REPLACEMENT PROJECT, per its TDLR project registration.

Who is the architect or design firm for MAIN STREET CURB REPLACEMENT PROJECT?

AIA ENGINEERS LTD is the design firm of record for MAIN STREET CURB REPLACEMENT PROJECT, according to its TDLR filing.

How much does MAIN STREET CURB REPLACEMENT PROJECT cost and how big is it?

MAIN STREET CURB REPLACEMENT PROJECT has an estimated construction value of $66K, based on its TDLR filing.

Scope of Work

Replacement of the Curb Ramps at the corner of Pierce and Main Street and St Joseph at Main Street

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1900 MAIN STREET, Houston, TX, 77002

Loading location map…
29.75022, -95.37033

Watch all construction in 77002 (Houston)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.