Project intelligenceTDLR EABPRJB4820022Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

BOWIE HS PHASE 2 BLEACHER REPLACEMENT

4103 SLAUGHTER LANE, Austin, TX, 78749

Construction complete · Jan 2015Project Closed

BOWIE HS PHASE 2 BLEACHER REPLACEMENT is a renovation/alteration project at 4103 SLAUGHTER LANE, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2015). The project has an estimated value of $80K.

Estimated project value
$80K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 31, 2014154 days across supplied datesJan 1, 2015

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    123 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    31 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78749 (Austin)

One email per change. Unsubscribe in one click. Privacy.

BOWIE HS PHASE 2 BLEACHER REPLACEMENT is a Renovation/Alteration project located at 4103 SLAUGHTER LANE, Austin, TX 78749 in Austin, Texas. The project has an estimated value of $80K. BOWIE HIGH SCHOOL is the property owner and AUSTIN ARCHITECTURE PLUS is the design firm of record. The project was registered with TDLR on July 31, 2014.

Frequently Asked Questions

What is BOWIE HS PHASE 2 BLEACHER REPLACEMENT?

BOWIE HS PHASE 2 BLEACHER REPLACEMENT is a renovation/alteration project at 4103 SLAUGHTER LANE in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replacement of the existing movable, telescoping bleachers in the gymnasium.

Is BOWIE HS PHASE 2 BLEACHER REPLACEMENT open in Austin?

Construction on BOWIE HS PHASE 2 BLEACHER REPLACEMENT is complete — TDLR records show the project passed its required accessibility inspection in Jan 2015. The building is finished and very likely open.

Where is BOWIE HS PHASE 2 BLEACHER REPLACEMENT located?

BOWIE HS PHASE 2 BLEACHER REPLACEMENT is located at 4103 SLAUGHTER LANE, Austin, TX, 78749, in Travis County.

Who is the owner or developer of BOWIE HS PHASE 2 BLEACHER REPLACEMENT?

BOWIE HIGH SCHOOL is the property owner/developer of record for BOWIE HS PHASE 2 BLEACHER REPLACEMENT, per its TDLR project registration.

Who is the architect or design firm for BOWIE HS PHASE 2 BLEACHER REPLACEMENT?

AUSTIN ARCHITECTURE PLUS is the design firm of record for BOWIE HS PHASE 2 BLEACHER REPLACEMENT, according to its TDLR filing.

How much does BOWIE HS PHASE 2 BLEACHER REPLACEMENT cost and how big is it?

BOWIE HS PHASE 2 BLEACHER REPLACEMENT has an estimated construction value of $80K, based on its TDLR filing.

Scope of Work

Replacement of the existing movable, telescoping bleachers in the gymnasium.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

4103 SLAUGHTER LANE, Austin, TX, 78749

30.18909, -97.85694

Related City Permits

Building permits found at or near this location

4103 W SLAUGHTER LN
145 ft away

New installation of light poles for existing public education BLDG FBFIELD 277/480v 400amp CT service

ActiveElectrical PermitNewJun 2026
View Details
2025-150010 EP
Hellas Construction
4103 W SLAUGHTER LN
145 ft away

New installation of light poles for existing public education

ActiveBuilding PermitNewDec 2025
$45K
View Details
2025-150010 BP
Hellas Construction, Inc.
4103 W SLAUGHTER LN BLDG FBFIELD
145 ft away

Stand-Alone - CONDUIT ONLY PERMIT Work consists of conduit work for the new sports complex at Bowie High School. Work that is involved: CONDUIT ONLY: For Sports Lighting Scoreboards Time-Clocks Pressboxes Was granted the permission by Interim Director Keith Mars to pull a Stand Alone for CONDUIT ONLY so we are not delayed. The Conditional Site Permit was based off the Site Plan Number: SP-2024-0439CX. All other work outside of Conduit work will be installed and inspected once the building permit is submitted.

ExpiredElectrical PermitRepairSep 2025
View Details
2025-119667 EP
Hellas Construction
4103 W SLAUGHTER LN
145 ft away

Test Gas Line for Pulled Meter

FinalPlumbing PermitRepairJun 2025
View Details
2025-076164 PP
S I MECHANICAL LLC
4103 W SLAUGHTER LN
145 ft away

Repair and expansion of capacity at the existing central plant. Replacement of AHUs and piping to support transition to the air-cooled system for an Existing Bowie High School

FinalElectrical PermitRemodelApr 2025
View Details
2024-143790 EP
Tumlinson Electric

Watch all construction in 78749 (Austin)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.