BOWIE HS PHASE 2 BLEACHER REPLACEMENT
BOWIE HS PHASE 2 BLEACHER REPLACEMENT is a renovation/alteration project at 4103 SLAUGHTER LANE, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2015). The project has an estimated value of $80K.
๐Project Metrics
TDLR #EABPRJB4820022Project Closed
Project has been completed and closed
BOWIE HS PHASE 2 BLEACHER REPLACEMENT is a Renovation/Alteration project located at 4103 SLAUGHTER LANE, Austin, TX 78749 in Austin, Texas. The project has an estimated value of $80K. BOWIE HIGH SCHOOL is the property owner and AUSTIN ARCHITECTURE PLUS is the design firm of record. The project was registered with TDLR on July 31, 2014.
โFrequently Asked Questions
What is BOWIE HS PHASE 2 BLEACHER REPLACEMENT?
BOWIE HS PHASE 2 BLEACHER REPLACEMENT is a renovation/alteration project at 4103 SLAUGHTER LANE in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replacement of the existing movable, telescoping bleachers in the gymnasium.
Is BOWIE HS PHASE 2 BLEACHER REPLACEMENT open in Austin?
Construction on BOWIE HS PHASE 2 BLEACHER REPLACEMENT is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2015. The building is finished and very likely open.
Where is BOWIE HS PHASE 2 BLEACHER REPLACEMENT located?
BOWIE HS PHASE 2 BLEACHER REPLACEMENT is located at 4103 SLAUGHTER LANE, Austin, TX, 78749, in Travis County.
Who is the owner or developer of BOWIE HS PHASE 2 BLEACHER REPLACEMENT?
BOWIE HIGH SCHOOL is the property owner/developer of record for BOWIE HS PHASE 2 BLEACHER REPLACEMENT, per its TDLR project registration.
Who is the architect or design firm for BOWIE HS PHASE 2 BLEACHER REPLACEMENT?
AUSTIN ARCHITECTURE PLUS is the design firm of record for BOWIE HS PHASE 2 BLEACHER REPLACEMENT, according to its TDLR filing.
How much does BOWIE HS PHASE 2 BLEACHER REPLACEMENT cost and how big is it?
BOWIE HS PHASE 2 BLEACHER REPLACEMENT has an estimated construction value of $80K, based on its TDLR filing.
๐Scope of Work
Replacement of the existing movable, telescoping bleachers in the gymnasium.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 31, 2014
Review Complete
Inspection Complete
Closed
Jan 1, 2015
๐Related Projects
๐คSame Owner
$1.3M total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
New installation of light poles for existing public education BLDG FBFIELD 277/480v 400amp CT service
New installation of light poles for existing public education
Stand-Alone - CONDUIT ONLY PERMIT Work consists of conduit work for the new sports complex at Bowie High School. Work that is involved: CONDUIT ONLY: For Sports Lighting Scoreboards Time-Clocks Pressboxes Was granted the permission by Interim Director Keith Mars to pull a Stand Alone for CONDUIT ONLY so we are not delayed. The Conditional Site Permit was based off the Site Plan Number: SP-2024-0439CX. All other work outside of Conduit work will be installed and inspected once the building permit is submitted.
Test Gas Line for Pulled Meter
Interior remodel of administrative building to include a secure entry vestibule safe side access vestibule and replace support service areas disrupted: conference and office.
๐Related Site Plans
City of Austin site plan approvals at this location