Project has been completed and closed
BOWIE HS PHASE 2 BLEACHER REPLACEMENT is a Renovation/Alteration project located at 4103 SLAUGHTER LANE, Austin, TX 78749 in Austin, Texas. The project has an estimated value of $80K. BOWIE HIGH SCHOOL is the property owner and AUSTIN ARCHITECTURE PLUS is the design firm of record. The project was registered with TDLR on July 31, 2014.
Replacement of the existing movable, telescoping bleachers in the gymnasium.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jul 31, 2014
Review Complete
Inspection Complete
Closed
Jan 1, 2015
Building permits found at or near this location
New installation of light poles for existing public education
Stand-Alone - CONDUIT ONLY PERMIT Work consists of conduit work for the new sports complex at Bowie High School. Work that is involved: CONDUIT ONLY: For Sports Lighting Scoreboards Time-Clocks Pressboxes Was granted the permission by Interim Director Keith Mars to pull a Stand Alone for CONDUIT ONLY so we are not delayed. The Conditional Site Permit was based off the Site Plan Number: SP-2024-0439CX. All other work outside of Conduit work will be installed and inspected once the building permit is submitted.
Test Gas Line for Pulled Meter
Interior remodel of administrative building to include a secure entry vestibule safe side access vestibule and replace support service areas disrupted: conference and office.
Repair and expansion of capacity at the existing central plant. Replacement of AHUs and piping to support transition to the air-cooled system for an Existing Bowie High School