MERIDIAN REMODEL
MERIDIAN REMODEL is a renovation/alteration project at 555 REPUBLIC DRIVE Floor 02, Plano, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2014). The project has an estimated value of $91K.
๐Project Metrics
TDLR #EABPRJB4821554Project Closed
Project has been completed and closed
MERIDIAN REMODEL is a Renovation/Alteration project located at 555 REPUBLIC DRIVE Floor 02, Plano, TX 75074 in Plano, Texas. The project has an estimated value of $91K. REPUBLIC PLACE TIC ETAL is the property owner and GO STUDIO is the design firm of record. The project was registered with TDLR on August 25, 2014.
โFrequently Asked Questions
What is MERIDIAN REMODEL?
MERIDIAN REMODEL is a renovation/alteration project at 555 REPUBLIC DRIVE Floor 02 in Plano, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovation to existing office space in mid-riseoffice building
Is MERIDIAN REMODEL open in Plano?
Construction on MERIDIAN REMODEL is complete โ TDLR records show the project passed its required accessibility inspection in Nov 2014. The building is finished and very likely open.
Where is MERIDIAN REMODEL located?
MERIDIAN REMODEL is located at 555 REPUBLIC DRIVE Floor 02, Plano, TX, 75074, in Collin County.
Who is the owner or developer of MERIDIAN REMODEL?
REPUBLIC PLACE TIC ETAL is the property owner/developer of record for MERIDIAN REMODEL, per its TDLR project registration.
Who is the architect or design firm for MERIDIAN REMODEL?
GO STUDIO is the design firm of record for MERIDIAN REMODEL, according to its TDLR filing.
How much does MERIDIAN REMODEL cost and how big is it?
MERIDIAN REMODEL has an estimated construction value of $91K, based on its TDLR filing.
๐Scope of Work
Interior renovation to existing office space in mid-riseoffice building
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 25, 2014
Review Complete
Inspection Complete
Closed
Nov 1, 2014