Project intelligenceTDLR EABPRJB5000033New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

LEAKEY ISD CAFETORIUM, GYMNASIUM, SCIECE

429 HWY 83 N, Leakey, TX, 78873

Construction complete · Dec 2015Project Closed

LEAKEY ISD CAFETORIUM, GYMNASIUM, SCIECE is a new construction project at 429 HWY 83 N, Leakey, in Real County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2015). The project has an estimated value of $6.5M.

Estimated project value
$6.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 24, 2014403 days across supplied datesDec 1, 2015

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    38 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    365 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78873 (Leakey)

One email per change. Unsubscribe in one click. Privacy.

LEAKEY ISD CAFETORIUM, GYMNASIUM, SCIECE is a New Construction project located at 429 HWY 83 N, Leakey, TX 78873 in Leakey, Texas. The project has an estimated value of $6.5M. LEAKEY ISD is the property owner and BUILDING DESIGN GROUP (FIRM#F-744) is the design firm of record. The project was registered with TDLR on October 24, 2014.

Frequently Asked Questions

What is LEAKEY ISD CAFETORIUM, GYMNASIUM, SCIECE?

LEAKEY ISD CAFETORIUM, GYMNASIUM, SCIECE is a new construction project at 429 HWY 83 N in Leakey, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: NEW CAFETORIUM, GYSNASIUM, SCIENCE LABS & CLASSROOMS FORLEAKEY HIGH SCHOOL PF175

Is LEAKEY ISD CAFETORIUM, GYMNASIUM, SCIECE open in Leakey?

Construction on LEAKEY ISD CAFETORIUM, GYMNASIUM, SCIECE is complete — TDLR records show the project passed its required accessibility inspection in Dec 2015. The building is finished and very likely open.

Where is LEAKEY ISD CAFETORIUM, GYMNASIUM, SCIECE located?

LEAKEY ISD CAFETORIUM, GYMNASIUM, SCIECE is located at 429 HWY 83 N, Leakey, TX, 78873, in Real County.

Who is the owner or developer of LEAKEY ISD CAFETORIUM, GYMNASIUM, SCIECE?

LEAKEY ISD is the property owner/developer of record for LEAKEY ISD CAFETORIUM, GYMNASIUM, SCIECE, per its TDLR project registration.

Who is the architect or design firm for LEAKEY ISD CAFETORIUM, GYMNASIUM, SCIECE?

BUILDING DESIGN GROUP (FIRM#F-744) is the design firm of record for LEAKEY ISD CAFETORIUM, GYMNASIUM, SCIECE, according to its TDLR filing.

How much does LEAKEY ISD CAFETORIUM, GYMNASIUM, SCIECE cost and how big is it?

LEAKEY ISD CAFETORIUM, GYMNASIUM, SCIECE has an estimated construction value of $6.5M, based on its TDLR filing.

Scope of Work

NEW CAFETORIUM, GYSNASIUM, SCIENCE LABS & CLASSROOMS FORLEAKEY HIGH SCHOOL PF175

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

429 HWY 83 N, Leakey, TX, 78873

Location by street address

Watch all construction in 78873 (Leakey)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.