HALDOR TOPSOE
HALDOR TOPSOE is a new construction project at 10010 BAYPORT ROAD, Pasadena, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2019). The project has an estimated value of $3.0M.
๐Project Metrics
TDLR #EABPRJB5801248Project Closed
Project has been completed and closed
HALDOR TOPSOE is a New Construction project located at 10010 BAYPORT ROAD, Pasadena, TX 77507 in Pasadena, Texas. The project has an estimated value of $3.0M. HALDOR TOPSOE INC. is the property owner and MIDDOUGH INC. is the design firm of record. The project was registered with TDLR on September 19, 2014.
โFrequently Asked Questions
What is HALDOR TOPSOE?
HALDOR TOPSOE is a new construction project at 10010 BAYPORT ROAD in Pasadena, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New 6,600 SF two story office building with ground levelparking connecting to an existing single story office b
Is HALDOR TOPSOE open in Pasadena?
Construction on HALDOR TOPSOE is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2019. The building is finished and very likely open.
Where is HALDOR TOPSOE located?
HALDOR TOPSOE is located at 10010 BAYPORT ROAD, Pasadena, TX, 77507, in Harris County.
Who is the owner or developer of HALDOR TOPSOE?
HALDOR TOPSOE INC. is the property owner/developer of record for HALDOR TOPSOE, per its TDLR project registration.
Who is the architect or design firm for HALDOR TOPSOE?
MIDDOUGH INC. is the design firm of record for HALDOR TOPSOE, according to its TDLR filing.
How much does HALDOR TOPSOE cost and how big is it?
HALDOR TOPSOE has an estimated construction value of $3.0M, based on its TDLR filing.
๐Scope of Work
New 6,600 SF two story office building with ground levelparking connecting to an existing single story office b
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 19, 2014
Review Complete
Inspection Complete
Closed
Dec 31, 2019
๐Related Projects
๐๏ธSame Design Firm
$6.8M totalProperty Owner
Design Firm
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Harris County
Find General Contractors in Harris