Project intelligenceTDLR EABPRJB5802484Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

UMC I-27 PAIN MANAGEMENT REMODEL

4105 INTERSTATE 27, Lubbock, TX, 79404

Construction complete · Feb 2015Project Closed

UMC I-27 PAIN MANAGEMENT REMODEL is a renovation/alteration project at 4105 INTERSTATE 27, Lubbock, in Lubbock County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2015). The project has an estimated value of $100K.

Estimated project value
$100K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 8, 2014116 days across supplied datesFeb 1, 2015

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    24 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    92 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79404 (Lubbock)

One email per change. Unsubscribe in one click. Privacy.

UMC I-27 PAIN MANAGEMENT REMODEL is a Renovation/Alteration project located at 4105 INTERSTATE 27, Lubbock, TX 79404 in Lubbock, Texas. The project has an estimated value of $100K. UMC HEALTH SYSTEMS is the property owner and CONDRAY DESIGN GROUP is the design firm of record. The project was registered with TDLR on October 8, 2014.

Frequently Asked Questions

What is UMC I-27 PAIN MANAGEMENT REMODEL?

UMC I-27 PAIN MANAGEMENT REMODEL is a renovation/alteration project at 4105 INTERSTATE 27 in Lubbock, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of portion of existing clinic

Is UMC I-27 PAIN MANAGEMENT REMODEL open in Lubbock?

Construction on UMC I-27 PAIN MANAGEMENT REMODEL is complete — TDLR records show the project passed its required accessibility inspection in Feb 2015. The building is finished and very likely open.

Where is UMC I-27 PAIN MANAGEMENT REMODEL located?

UMC I-27 PAIN MANAGEMENT REMODEL is located at 4105 INTERSTATE 27, Lubbock, TX, 79404, in Lubbock County.

Who is the owner or developer of UMC I-27 PAIN MANAGEMENT REMODEL?

UMC HEALTH SYSTEMS is the property owner/developer of record for UMC I-27 PAIN MANAGEMENT REMODEL, per its TDLR project registration.

Who is the architect or design firm for UMC I-27 PAIN MANAGEMENT REMODEL?

CONDRAY DESIGN GROUP is the design firm of record for UMC I-27 PAIN MANAGEMENT REMODEL, according to its TDLR filing.

How much does UMC I-27 PAIN MANAGEMENT REMODEL cost and how big is it?

UMC I-27 PAIN MANAGEMENT REMODEL has an estimated construction value of $100K, based on its TDLR filing.

Scope of Work

Renovation of portion of existing clinic

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

4105 INTERSTATE 27, Lubbock, TX, 79404

33.55656, -101.84373

Watch all construction in 79404 (Lubbock)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.